My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:35:36 PM
Creation date
5/1/2020 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FW: ripon farm service work pl Page 2 of 2 <br /> bgs. <br /> • A groundwater extraction well terminating in the shallow water <br /> bearing zone. <br /> • An extraction well pump test for aquifer characterization. <br /> • All wells and borings will be sampled at about five foot <br /> intervals throughout the boring length and analyzed for nitrate and <br /> ammonium. <br /> • An isotope analysis will be conducted on shallow groundwater <br /> obtained from off-site monitoring wells RMW-ISR,RMW-3S and the on-site <br /> extraction well,and will be conducted on deeper groundwater obtained <br /> from offsite wells RMW-1D and RMW 3D. " <br /> and now the conditions: <br /> "Central Valley Water Board staff conditionally concur with the Revised <br /> Work Plan,subject to the following changes. <br /> • Before disposing of aquifer test water,provide evidence that <br /> the discharge location is acceptable to the receiver. <br /> • Provide an updated figure of boring locations that illustrates a <br /> deep boring near the western surface water sump(they can move boring <br /> locations around to meet the request) <br /> • Add an isotope analysis from groundwater obtained from the <br /> deeper water-bearing zone on-site,and identify where it shall be <br /> obtained from. <br /> Please submit the updated figure for Central Valley Water Board staff <br /> concurrence prior to implementing field work,conduct the field work <br /> prior to 31 October 2009,and provide a report of results by 26 February <br /> 2010." <br /> I suspect that the final letter will not be substantially different <br /> than this. Just more verbage. <br /> Thanks for your time, <br /> If you have any questions,you may contact me at(916)464-4680. <br /> Here's the Geotracker link to the work plan <br /> haps•//geotracker.waterboards.ca�ov/regulators/deliverable documents/3431241691/Ripon%20Work%20P1an0709%2Epdf <br /> Amy Terrell <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive Suite 200 <br /> Rancho Cordova,CA 95670-6114 <br /> (916)464-4680 <br /> aterrell@waterboards.ca.gov <br /> 7/27/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.