My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GE <br /> GENESIS ENGINEERING& REDEVELOPMENT <br /> 4. Advancing a boring to the bottom of the shallow water bearing unit, estimated <br /> to be approximately 60 feet bgs,and installing an 6-inch diameter pump test <br /> well. Soil samples will be collected from the boring at approximate depths of 1 <br /> foot, 5 feet, 10 feet, 15 feet, 20 feet, 25 feet, 30 feet, 35 feet, 40 feet,45 feet, 50 <br /> feet, 55 feet, and 60 feet bgs. Soil type will be logged for each boring. A <br /> groundwater sample will be collected from the test well following well <br /> development. <br /> 5. Analyzing all soil and groundwater samples for nitrate and ammonium. <br /> 6. Analyzing select soil samples for permeability. <br /> 7. Analyzing select water samples for nitrogen isotope rations and tritium. <br /> 2.2 Site Reconnaissance, Preparation,and Restoration <br /> A Site reconnaissance will be conducted to locate and mark the boring locations. Boring <br /> locations in areas with soil or vegetative ground surface will be marked using wooden survey <br /> stakes. Boring locations in paved areas will be marked using surveying paint. The boring <br /> locations shall also be evaluated for access routes. <br /> Site preparation will include clearing the proposed boring locations of underground utilities <br /> and other obstructions for subsurface activities. The proposed boring locations may be <br /> adjusted based on the results of the subsurface survey. <br /> Upon completion of field sampling activities, disturbed areas will be restored to a level that, <br /> as closely as practical, approximates the conditions at the beginning of the field work. <br /> 2.3 Drilling and Logging Techniques <br /> All drilling activities shall conform to state and local regulations and shall be supervised by a <br /> Licensed Geologist. The following procedures shall be followed during the drilling of <br /> exploratory borings and collection of subsurface soil and groundwater samples. <br /> • Drilling and sampling equipment shall be decontaminated as described in <br /> Section 2.4 <br /> Ripon Farm Services,Inc. 2 of 15 <br /> Sampling and Analysis Plan <br /> July 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.