5.0 SCHEDULE <br /> The Aquifer Test Program will begin after the pumping well has been developed. Testing <br /> will occur over a one-week period. Data analyses will occur immediately after testing. <br /> Approximately four weeks after completing the analyses, a Technical Memorandum will be <br /> prepared for review. The results of the test can be incorporated into the design of an interim <br /> groundwater extraction system, should one be required. <br /> Ripon Farm Services,Inc. 4 of 4 <br /> Aquifer Testing Work Plan <br /> July 2009 <br />