My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Frequent measurements are required in the pumping well during the early stages of the test to <br /> define the drawdown curve. In addition to the electronic measurements,water levels will <br /> also be manually monitored periodically(at the end of each of the cycles described during <br /> the electronic data collection)using an electric sounding device. <br /> During the initial hours of the test, discharge will be monitored through the flow meter and <br /> recorded frequently until the discharge rate has stabilized. From there on,the discharge will <br /> be checked at least four times during the test using a 5-gallon bucket and a stopwatch. Test <br /> data will be recorded on field forms. <br /> 2.5 Task 5—Recovery Test <br /> Immediately after terminating the constant-discharge pumping test, the post pumping <br /> recovery test will begin. The recovery test will be conducted for approximately 12 hours or <br /> until the well has recovered to within 80 percent of the original drawdown. During the <br /> recovery test,water levels will be monitored in the pumping and observation wells at the <br /> same frequency as the constant discharge test. Completion of the recovery test will mark the <br /> end of the aquifer testing program. <br /> 2.6 Task 6—Water Disposal <br /> During the aquifer testing, groundwater will be stored in a Baker Tanks before disposal in <br /> accordance with local, State, and Federal rules and regulations. Disposal will require water <br /> quality monitoring during the test or at the end of the test. A minimum of two samples per <br /> test is anticipated in order to characterize the extracted groundwater before disposal into the <br /> City of Ripon non-potable water conveyance system located adjacent to the Site on Frontage <br /> Road. <br /> 3.0 DATA REDUCTION AND ANALYSIS <br /> The aquifer test data will be downloaded electronically and analyzed using the computer <br /> program AQTESOLV. This program provides a graphic display of the data and an on-screen <br /> visual matching of"type curves"to the test data. This procedure allows one to see the <br /> position of the type curves and the estimated aquifer properties throughout the analysis. The <br /> AQTESOLV program also provides the appropriate solutions for analysis. <br /> 4.0 REPORTING <br /> The results and analysis of the Aquifer Test Program will be provided in a technical <br /> memorandum. The memorandum will include a discussion of the testing procedures as well <br /> as a display of the tabular data and plots. Assumptions made in utilizing a particular method <br /> of analysis will also be discussed. <br /> Ripon Farm Services,Inc. 3 of 4 <br /> Aquifer Testing Work Plan <br /> July 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.