Laserfiche WebLink
6E "� <br /> GENESIS ENGINEERING& REDEVELOPMENT <br /> The continuous soil cores from each boring will be logged for soil type. Soil samples will be <br /> taken from each boring at depths of 1 foot, 5 feet, 10 feet, 15 feet, 20 feet bgs, and in the <br /> vadose zone immediately above the soil/water interface. <br /> The drilling and soil and groundwater sampling procedures are discussed in Appendix A. <br /> The soil and groundwater samples will be analyzed for nitrate using EPA Method 300.1 and <br /> ammonium using EPA Method 350.1. <br /> 2.2.2 Shallow Monitoring Wells <br /> Seven soil borings will be advanced to the soil/water interface as described in Section 2.2.1. Tll Z/D <br /> These borings however will continue to be advanced to a depth similar to that of the existing <br /> on-Site monitoring wells, approximately 40 feet bgs, and then converted to monitoring wells. <br /> Continuous soil cores will be logged for soil-type information. Soil samples will be collected <br /> at 5 foot depth intervals(1 foot, 5 feet, 10 feet, 15 feet, 20 feet, 25 feet, 30 feet, 35 feet, and <br /> 40 feet bgs). <br /> The boreholes will be converted into 2-inch diameter monitoring wells,with the well screen <br /> interval extending from 30 feet to 40 feet bgs. The size of the well screen slots will be <br /> determined based on subsurface material encountered at each proposed monitoring well <br /> location. Upon completion of construction of the monitoring wells, each well will be <br /> developed using surge and bail, and pumping techniques. Following well development, the <br /> monitoring wells will be purged and groundwater samples collected. <br /> The drilling,well installation, and soil and groundwater sampling procedures are discussed in <br /> Appendix A. The soil and groundwater samples will be analyzed for nitrate using EPA <br /> Method 300.1 and ammonium using EPA Method 350.1. <br /> 2.2.3 Deep Borings <br /> Five deep exploratory borings will be advanced to the base of the on-Site water production <br /> well (195 feet bgs)using Roto-Sonic drilling technology. The continuous soil cores from <br /> each boring will be logged for soil type. Soil samples will be collected at 20 foot depth <br /> intervals (20 feet,40 feet, 60 feet, 80 feet, 100 feet, 120 feet, 140 feet, 160 feet, 180 feet, and <br /> the bottom of the borehole 195 feet bgs). Soil samples also will be collected of the finer <br /> grained material present between the shallow and deep water bearing units and tested for <br /> vertical permeability. <br /> Based on the well log for the on-site water production well, two sandy,potentially saturated <br /> water bearing units may be present at estimated depths of 105 to 108 feet and 153 to 157 feet <br /> Ripon Farm Services 4 of 7 <br /> Site Characterization Work Plan—Phase II <br /> July 2009 <br />