Laserfiche WebLink
GE <br /> GENESIS ENGINEERING& REDEVELOPMENT <br /> 2. Marking and clearing proposed boring locations of subsurface utilities and other <br /> subsurface obstructions; <br /> 3. Obtaining boring permits from the San Joaquin County Environmental Health <br /> Department; <br /> 4. Developing and administering contracts for the drilling subcontractor, analytical <br /> laboratory, and subsurface utility locator; <br /> 5. Implementing a Site-specific Health and Safety Plan; and <br /> 6. Maintaining contact with the RWQCB and county and municipal agencies as to <br /> drilling schedules and other field activities requiring oversight. <br /> 2.2 Task 2—Vertical and Lateral Nitrate Profile <br /> Vertical and lateral profiles of the nitrate concentrations in the soil and groundwater on Site <br /> will be developed by advancing 2eexploratory borings at the locations shown on Figure 3. <br /> The exploratory borings are located near areas previously identified as having elevated <br /> nitrate concentrations. The exploratory borings in.clud 4- 0 r R- H/Q6 u, t � <br /> 1. Ten exploratory borings to measure depth-discrete nitrate concentrations in surface <br /> soils; <br /> 2. Seven exploratory borings to measure the depth-discrete nitrate concentrations in <br /> surface soils and for the installation of seven shallow groundwater monitoring <br /> wells; and <br /> 3. Five exploratory borings to measure the depth-discrete nitrate concentrations to a <br /> depth of 195 feet below ground surface ("bgs")—the depth of the top of the deeper <br /> water bearing unit; and to collect reconnaissance groundwater samples from all <br /> water bearing units encountered to a depth of 195 feet bgs. <br /> 2.2.1 Shallow Borings <br /> The 10 shallow soil borings will be advanced to the soil/water interface of the shallow water <br /> bearing unit using direct push drilling technology. The approximate depth of the borings is <br /> 25 feet bgs, as estimated from the depth to groundwater measurements taken from adjacent <br /> on-Site monitoring wells. <br /> Ripon Farm Services 3 of 7 <br /> Site Characterization Work Plan—Phase II <br /> July 2009 <br />