My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�E <br /> GENESIS ENGINEERING & REDEVELOPMENT <br /> This monitoring/pump test well will be available for use as an extraction well should <br /> treatment of the shallow water bearing unit be included as a remediation alternative. <br /> 2.5 Task 5—Isotope Analyses <br /> Groundwater samples will be collected from two existing well pairs (RMW-ISR and RMW- <br /> 1D, RMW-3S and RMW-313) and the shallow aquifer test well that will be installed as part <br /> of this investigation. These samples will be tested for nitrate using EPA Method 300.1 and <br /> ammonium using EPA Method E350.1. In addition the samples will be tested for nitrogen <br /> isotope ratio and tritium. The purpose of these additional analyses is to compare the age of <br /> the shallow groundwater to the deeper groundwater and to assess whether nitrate in shallow <br /> and deep groundwater is from fertilizer or animal waste, to further evaluate a potential <br /> interconnection between the shallow and deep aquifers. <br /> 2.6 Task 6—Data Analysis and Reporting <br /> A report summarizing the results of the work activities associated with the Work Plan will be <br /> prepared. The report will include the tables,maps, figures, and appendices summarizing the <br /> data collected during the field activities and supporting: <br /> 1. A vertical and lateral delineation of nitrate in soil to the top of the deep water bearing <br /> unit; <br /> 2. A lateral delineation of nitrate in shallow groundwater beneath the Site; <br /> 3. A vertical delineation of nitrate in groundwater beneath the Site; <br /> 4. A discussion of groundwater properties in the shallow water bearing unit at the Site; <br /> 5. An interpretation of interconnection between the shallow and deep water bearing <br /> units at the Site; <br /> 6. A schedule and list of tasks to investigate ways to prevent the migration of nitrates <br /> from soil to groundwater at the Site; and <br /> 7. A schedule and list of tasks to investigate ways to prevent the migration of nitrates <br /> from shallow groundwater to deeper groundwater at the Site. <br /> Ripon Farm Services 6 of 7 <br /> Site Characterization Work Plan—Phase Q <br /> July 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.