My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:32:29 PM
Creation date
5/1/2020 2:24:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENESIS ENGINEERING & REDEVELOPMENT <br /> 3.0 SCHEDULE <br /> The specific sequence of the field investigation tasks is flexible. After the pre-field activities <br /> have been completed, GE&R proposes to advance one of the deep borings. Soil and <br /> groundwater chemistry and lithologic samples collected from this initial boring will be used <br /> to modify the additional exploratory boring program, if appropriate. The aquifer test will be <br /> conducted after installation and development of the shallow monitoring wells, and allowing <br /> these wells to equilibrate. <br /> Pre-field Activities <br /> Pre-field activities will commence upon receiving an authorization to proceed. Pre- <br /> field activities will be completed within 10 days. <br /> Deep Exploratory Borings <br /> The five deep exploratory borings will be advanced. Depending upon the subsurface <br /> material encountered in the initial deep exploratory boring,the depth interval of soil <br /> and reconnaissance groundwater samples may be adjusted. Each deep exploratory <br /> boring will take approximately 5-6 days to complete. The five deep exploratory <br /> borings will take 5-6 weeks to complete. <br /> Shallow Aquifer Test Well <br /> The well designated as the shallow aquifer test well will be installed following <br /> installation of the deep exploratory borings. The shallow aquifer test well will take 2- <br /> 3 days to install and develop. <br /> Reconnaissance Soil Borings <br /> Ten exploratory soil borings will be advanced. Advancement and sampling of the <br /> exploratory borings may take up to one week to complete. <br /> Shallow Groundwater Monitoring Wells <br /> Seven shallow monitoring wells will be installed in addition to the shallow aquifer <br /> test well. It will take approximately 1-2 weeks to install and develop the shallow <br /> monitoring wells. <br /> Aquifer Tests <br /> Ripon Farm Services 7 of 7 <br /> Site Characterization Work Plan—Phase 11 <br /> July 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.