Gfffir-c <br /> GENESIS ENGINEERING&REDEVELOPMENT <br /> The shallow aquifer test (24 to 72 hour)will be conducted using two existing shallow <br /> monitoring wells as observation wells. It will take approximately one week to set up, <br /> conduct the aquifer test, and allow the system to equilibrate. <br /> Ripon Farm Services 8 of 7 <br /> Site Characterization Work Plan—Phase H <br /> July 2009 <br />