Laserfiche WebLink
CLIENT- <br /> W. <br /> LIENT:W. Lathrop Rd. E. Lathro Rd. <br /> >„ Thomsen Northgate <br /> W. Louis ve. E. Louise ve. <br /> GENERAL NOTES <br /> 99 ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. <br /> San <br /> Joaq' n W. YOSEMITE A v' E. Y SEMIT AVE. THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD <br /> Ho � FINISHES IN PLACE. ARCO <br /> R. <br /> 120 <br /> SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL EXISTING by WEST COAST PRODUCTS,LLC <br /> f PRODUCT PIPING IS DOUBLE CONTAINMENT PIPE. VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL 0 <br /> PIPE. <br /> ALLIANCE MANAGER, AGENT FOR BP: <br /> SITE 10 SITE AND PIPING DEMOLITION NOTES <br /> 205 -6 0� -0 <br /> of o <br /> U <br /> O 0 + <br /> d O <br /> N Q Q <br /> ui <br /> PIPING LEGEND- <br /> . _.....____.._ __ ................_ .... ................... 2" E.G. DOUBLE WALL PRODUCT PIPING <br /> Vicinity Map . ........................ ............................... 3" AND 2" F.G. SINGLE WALL VAPOR RECOVERY PIPING <br /> PAL 17$.68' .. ....... ...... ....... ....... ...... ....... ...... ...... ....... ..... 2" F.G. SINGLE WALL VENT PIPING (LOCATIONS ASSUMED) <br /> ............................._.._._........................................ .. ............_.... ...__ <br /> _. ._......____.............................. _....—_ ....__.. ._ ...................,............... ..... _ ....... ......................................................................-. - <br /> 16" HIGH CONCRETE BLOCK W NATIONAL SITE ADAPT CONSULTANT: <br /> DEMOLITION AREA <br /> HIGH RISE SIGN <br /> ......: <br /> ........:.::...... <br /> 3 <br /> .......................... Oj CONTRACTOR TO SAW CUT EXISTING CONCRETE DRIVE SLAB AS REQUIRED FOR REMOVAL OF EXISTING ' <br /> SEPTIC UNDERGROUND DISPENSER SUMPS AND PIPING. REMOVE EXISTING CONCRETE DISPENSER ISLANDS. <br /> i <br /> BPIPE OLLARD -_ TANK PROTECT CONCRETE AT EXISTING PIC (PAY ISLAND CASHIER) UNIT. PROTECT PIC UNIT IN PLACE. Z� <br /> co <br /> „..:. <br /> W�LLTORING G� <br /> O EXISTING UNDER DISPENSER CONTAINMENT PANS TO BE REMOVED. CUT BACK EXISTING PIPING AND <br /> ELECTRICAL CONDUIT AS REQUIRED. CONTRACTOR TO FIELD DETERMINE EXTENT OF PIPING TO BE <br /> REMOVED TO ACCOMMODATE THE NEW DISPENSER SUMPS THAT ARE TO BE INSTALLED. IT IS <br /> TANK VENTS <br /> CALCULATED THAT NO MORE THAT 33% OF EXISTING NO VAPOR RECOVERY PIPING WILL NEED TO BE "LAND PLANNING AND DESIGN SPECIALISTS" <br /> REMOVED IN ORDER TO COMPLETE THIS JOB, THEREFORE NO EVR UPGRADE WILL BE REQUIRED AS A 18215 72ND AVENUE SOUTH <br /> KENT, WASHINGTON 98032 <br /> .............. .. RESULT OF THIS PROJECT. 2 251-6222 <br /> {4 5) <br /> E <br /> EQUIP.RE <br /> EXISTING UNDERGROUND ENCLOSU EXISTING DISPENSERS TO BE REMOVED FROM ISLAND AND SAVED FOR RE—USE. <br /> STORAGE TANKS 3 <br /> I <br /> REVISION DESCRIPTION <br /> NO. DATE <br /> D CONTAINMENT PANS AND PORTIONS OF REMOVED OR UNDER PIPING AS k 5-20-08 ISSUED FOR PLAN CHECK <br /> DIRECTED BY LOCAL AGENCY <br /> EXISTING <br /> a rr� <br /> 3 � <br /> VEEDER ROOT p FILL MANHOLES THAT FAILED <br /> 5 REMOVE EXISTING 5 GALLON SPILL CONTAINMENT BUCKETS AT TANK 3 <br /> ALARM MONITOR SB-989 TESTING (BUCKETS ONLY ON CONCRETE BREAK REQUIRED). a <br /> �: .,::. I <br /> SYSTEM � I <br /> I ; / Facileity I <br /> 5 <br /> Ld <br /> EXISTING 5 GALLON SPILL 2 i _j <br /> BUCKETS TO BE 1.... .., 6 <br /> i <br /> U <br /> REMOVED/REPLACED AS <br /> �• j; COMPLIANCE NOTE 7 <br /> NEEDED ,...... . , % EMERGENCY PUMP <br /> 1. ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED IN THE FIELD BEFORE e <br /> i 1 STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS <br /> {HUTOFF SWITCH <br /> . € INDOOR & OUTDOOR <br /> ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH THE WORK. s <br /> __.. AIRWATER <br /> QI <br /> E AGENCIES FOR <br /> 2. GENERAL CONTRACTOR <br /> ! EXCAVATIONS OF TRENCHES 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO <br /> I :............... ...... r ^LL OBTAIN U la <br /> , ,,, ,,,,, <br /> rx <br /> a DESCEND. <br /> y, 1 <br /> EE) J <br /> I 2 <br /> J W,: ... 1 0- <br /> ii.,: ... _.. <br /> gc�IL 3 USE FOR THF INITFNDED PURPOSE A� r ' SEAL: <br /> NATIONALLY IARECOGNIZEDF.: G ,A LOCAL VCOIDES AND GOVENNING AUTHORITIES. <br /> rr F' f :.... ... ....... 4 E il`�5P AGENCIES AND BY OWNERS <br /> 1 <br /> < ' l FUELING SYSTEM TO B ECTED PER LOCAL REGULATING AL <br /> w ( REPRESENTATIVE PRIOR TO BEING PLACE BACK IN SERVICE. <br /> H <br /> .................. .... i P GRUBB <br /> I 5. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND —' x'67514;. <br /> APPROVED BY GOVERNING AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION (AS <br /> x <br /> h <br /> 30AIS <br /> ............ .............. ......... ......... ........,: .... /: Q <br /> :... <br /> ........ . f. . 6. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING �qT V �,FpF�\ - <br /> ry o ANNULAR SPACES OF TANK. OF CAS <br /> %' N 7 REFERENCED CODES SHALL INCLUDE 2007 C CONFIDENTIALITY STATEMENT:_ <br /> BC; 2007 CFC, ARTICLE 79; 2007 CEC; 2007 CMC. <br /> THE RECIPIENT OF THESE MATERIALS UNDERSTANDS THAT <br /> COPYRIGHT IN THE MATERIALS IS OWNED BY BP, AND ALSO, <br /> THAT THE MATERIALS CONTAIN PRIVILEGED AND CONFIDENTIAL <br /> ( � 8. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2007 CFC ARTICLE 87. FIRE EXTINGUISHERS BUSINESS INFORMATION OF BP. ACCORDINGLY, THE <br /> SHALL BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL RECIPIENT AGREES � <br /> CONFIDENCE AND AGREES <br /> RETAIN THESE MATERIALS IN STRICT EES NOT TO DISCLOSE THESE � <br /> MATERIALS TO ANY OTHER PARTY AND FURTHER AGREES Of <br /> TIMES. UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE LEFT OUT OF SERVICE NOT TO MAKE COPIES OF THE MATERIALS. THE REOPILNT <br /> p AGREES TO USE THE MATERfALS ONLY POR THE LIMITED <br /> OVERNIGHT. PURPOSE FOR WHICH BP HAS MADE THE MATERIALS 0 <br /> AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL M <br /> / MATERIALS TO BP EITHER UPON COMPLETION OF THE <br /> 1 ! INTENDED PURPOSE OR UPON THE REQUEST OF DP, m <br /> WHICHEVER COMES FIRST. <br /> EXISTING GILBARCO BH-1 MULTI HOSE PER2 CANOPY ABOVE PIPE AND TANK DESIGN DISCLAIMER: <br /> BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR X <br /> SIDE DISPENSERS TO BE REMOVED AND X PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WITH <br /> REINSTALLED. REMOVE UNDERGROUND J ALL LEGAL REQUIREMENTS THAT EXIST OR As THEY MAY BE <br /> APPLIED IN THE FUTURE. NOR DOES BP WARRANT THAT A <br /> DISPENSER PANS (T)?. OF 8} - FUELING STORAGE AND DELIVERY SYSTEM CONSTRUCTED IN a <br /> ITY WITH THESE PLANS WILL E FREE 0 <br /> ALL <br /> 'RACI <br /> LT(WITHOU RA ACCORDINGLY TONENG <br /> LEAKS. NEER LY COFU Y011RD TO <br /> CONSN <br /> CHOOSING TO INDEPENDENTLY EVALUATE WHETHER THESE F- <br /> 'p PLANS ARE TRULY SUFFICIENT FOR CONSTRUCTING THE <br /> STORAGE AND DELIVERY SYSTEM AT YOUR STATION. <br /> y' sDEVELOPMENT INFORMATION: <br /> z <br /> /'- <br /> SEWE UNDERGROUND STORAGE <br /> R \ <br /> SUMP ' <br /> ' TANK STANDARDS II <br /> ` DRY SUMP <br /> LOT UGH RY SUMP <br /> 3fi' 3" SB 989 SUMP REPLACEMENT <br /> ' <br /> Q <br /> •y f7 T <br /> 10.34 �_ `SEWER TELEPHONES o <br /> SITE ADDRESS <br /> .......................... UMP <br /> s <br /> grgs :.... ! S I � <br /> 1711 E YOSEMITE <br /> PIPE <br /> _. BOLLARD GHTLp <br /> A/W V7 MANTE <br /> _ <br /> n _..._..._.._. I.D. SIGN <br /> v <br /> s• •!'yY <br /> No. 06020 3; <br /> DESIGNED BY ALLIANCE <br /> ZdDM JPIVOQ99 CHECKED 6Y. OV REPM.DRAWING INDEX <br /> � <br /> i <br /> ., <br /> DRAWN <br /> BY ALLIANCE PM: <br /> jpD <br /> YOSEMITE DISPENSER SUMP REPLACEMENT AND PIPING DEMOLITION_ _ _ _ 3518 <br /> BLVD. BCE #-1 ION PLAN VERSION: PROJECT NO: <br /> STAT <br /> HWY. ftp) <br /> TK1-�1 DISPENSER SUMP REPLACEMENT AND PIPING REPAIR SITE PLAN DRAWING TITLE: <br /> E <br /> U <br /> D <br /> TK2-1 DISPENSER SUMP DETAILS: GILBARCO BH1 NARROW FRAME SITE PIPING <br /> DEMOLITION PLAN <br /> N <br /> SITE AND PIPING DEMOLITION PLAN DRAWING DISCLAIMER NOTE AQMD INFORMATION s <br /> THI`.S SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, NO. FUELING POSITIONS: 8 SHEET NO: o <br /> 0 5 10 20 SCALE: 1"=10'-0" Gall ToFree SURVEY, OR LEGAL DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO. GASOLINE NOZZLES: 16 <br /> "I (888) 258-0808 DOES NOT WARRANT THE ACTUAL LOCATION OF PROPERTY LINES AND N0. DIESEL NOZZLES: 0 <br /> TWO SET-BACKS, IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO <br /> WORKING DAYS VERIFY PROPERTY LINES AND SETBACK DISTANCES WHERE THEY MAY <br /> BEFORE YOU AFF=ECT THE PLACEMENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT. <br /> DIG <br /> THE DRAWING REFLECTS EXISTING SITE CONDITIONS AS PROVIDED BY BP DoiN <br /> 0 <br /> Ad <br /> FROM ARCHIVE RECORDS. 0 <br /> 17 <br /> 0 <br />