My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2008 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 4:03:53 PM
Creation date
5/4/2020 9:32:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2009
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIPING LEGEND CLIENT: <br /> EXISTING 2" F.G. DOUBLE WALL PRODUCT PIPING <br /> ................................. . EXISTING 3" AND 2" F.G. SINGLE WALL VAPOR RECOVERY PIPING <br /> ....... - EXISTING 2" F.G. SINGLE WALL VENT PIPING (LOCATIONS ASSUMED) AO <br /> — NEW 2" F.G. DOUBLE WALL PRODUCT PIPING <br /> NEW 3" AND 2" F.G. SINGLE WALL VAPOR RECOVERY PIPING <br /> X PIPING INTERCEPT POINT <br /> ARCO <br /> CONCRETE REPLACEMENT AS REQUIRED bP WEST COAST PRODUCTS,LLC <br /> O <br /> ALLIANCE MANAGER, AGENT FOR BP: <br /> P/L V&W <br /> ......... ............. ....... ....... ..... . ...... . ..—........ ........... ......... ..... ... ............ .. ............ ........... . <br /> GENERAL NOTES <br /> 16" HIGH CONCRETE BLOCK WALL <br /> ALL CONSTRUCTION IS EXISTING AND TO REMAIN UNLESS NOTED OTHERWISE. <br /> HIGH RISE SIGN <br /> THE CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING CANOPY COLUMNS, FOOTINGS AND SHROUD <br /> f.......... FINISHES IN PLACE. <br /> ..................................... <br /> ..... E, <br /> SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL EXISTING <br /> .. .............. <br /> SEPTIC PRODUCT PIPING IS DOUBLE CONTAINMENT PIPE, VAPOR RECOVERY AND VENT PIPING IS SINGLE WALL <br /> PIPE TANK PIPE., <br /> BOLLARD <br /> y :... ....:::... . MONITORING NATIONAL SITE ADAPT CONSULTANT: <br /> ...... ... ....... _. ..... ...... :..... ... <br /> I � INSTALLATION NOTES <br /> WELL <br /> - .... O EXISTING (2) 15,000 & (1) 12.,000 GALLON DOUBLE WALL TANKS TO REMAIN. GH -40 <br /> I I <br /> { INSTALL (8) NEW SINGLE WALL FIBERGLASS DISPENSER CONTAINMENT SUMPS AT DI Z <br /> O 2 VENT RISERS AS DISPENSER LOCATIONS <br /> ............. SHOWN. <br /> E I <br /> EQUIP. <br /> EXISTING UNDERGROUND 1 ENCLOSURE f' 3 EXISTING VEEDER—ROOT TLS-350 MONITORING SYSTEM PANEL TO REMAIN, CONTRACTOR TO REINSTALL <br /> STORAGE TANKS EXISTING LIQUID• ,; � SENSORS AT NEW <br /> DISPENSER CONTAINMENT SUMPS. <br /> �� o:..: <br /> f <br /> Q <br /> ...® INTO NEW DISPENSER CONTAIN DOUBLE WALL PRODUCT PIPING AND SINGLE WALL VAPOR PIPING <TfNO <br /> .. <br /> CONTRACTOR <br /> FIELD DETERMINED GUT/INTERCEPT POINTS. INSTALL <br /> TO EXTEND EXISTING <br /> (I <br /> .-�.-........ N DOUBLE—SIDED PENETRATION FITTINGS ON <br /> 1 NEW DOU (DED <br /> a ... FROM <br /> PIPE AND CONDUIT ENTRIES, <br /> "LAND PLANNING AND DESIGN SPECIALISTS" <br /> 0 o Q. 4 EXISTING VEEDER CONTRACTOR TO PERFORM SB-989 HYDROSTATIC TESTINIG ON EACH NEW DISPENSER CONTAINMENT 18215 72ND AVENUE SOUTH <br /> ROOT ALARM / SUMP' TO ENSURE INTEGRITY. KENT, WASHINGTON 98032 <br /> MONITOR TEM CONTRACTOR TO PERFORM SB989 PRESSURE TESTING ON ALL AFFECTED 425 251 -6222 <br /> 0 TOR SYS <br /> CONTAINMENT PIPING TO ENSURE INTEGRITY. CONTRACTOR TO PERFORM ALL ) <br /> �- - , Fac ! � ItfTESTSRR REQUIRED CFO FROM SECONDARY <br /> TCONDITIONS AND FORWARD RESULTS TO LOCAL JURISDICTION. { <br /> EXISTING 5 GALLON Y J <br /> SPILL BUCKETS TO BE — .......................... 0 EXTE�VD ELECTRICAL_ CONDUITS <br /> INTO NEW CONTAINMENT SUMPS, AND RE—PULL EXISTING WIRE (PULL NO. DATE REVISION DESCRIPTION <br /> REMOVED/REPLACED NEW IF NEEDED ONLY) FOLK POWER, DATA AND MONITORING. <br /> AS NEEDED77 <br /> 1 <br /> o Y <br /> 0 0 <br /> �� 5-20-08 IED FOR PLAN CHECK <br /> o q �7 EXISTIING GILBARCO ISSUED DISPENSERS TO BE RE—USED AND REINSTALLED IN LOCATIONS SHOWN. <br /> ` EHEROEF SWPUMP <br /> z ...... ! S UT F ITCH EXISTIING HANGING HARDWARE AND BALANCE" PHASE II VAPOR RECOVERY TO BE RE—USED/REMAIN. <br /> _. (INDOOR & OUTDOOR <br /> z <br /> � 3 <br /> — AIR/WATER ® INSTALL 6' HIGH NEW CONCRETE DISPENSER ISLANDS AND RE—INSTALL DRIVE SLAB AS REQUIRED. <br /> I o PROVIIDE #4 DOWELING @ 16" O.0 INTO EXISTING CONCRETE DRIVE SLAB TO MAKE CONCRETE DRIVE a <br /> _ SLAB REPAIRS. ALL CONCRETE TO BE 2,500 PSI MIN W/ #4 ® 16 O.C. BOTH WAYS. <br /> CD <br /> .� olie <br /> .. ....... ....................................... „�,.,I,. EXISTIING 5 GALLON FILL/VAPOR SPILL BUCKETS TO BE REMOVED/REPLACED AS NEEDED. RETEST PER e <br /> J ” <br /> a �y o o a .. .... ..... SB 989 PROCEDURES AND FORWARD TEST RESULTS TO LOCAL JURISDICTION <br /> r z <br /> 7 <br /> w �... ..... 4 EXTEND NEW PIPING INTO NEW <br /> s <br /> ry <br /> i SUMPS AS REQUIRED. COMPLIANCE NOTES 9 <br /> COMP <br /> RE—INSTALL TRAFFIC BOLLARDS 1. ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL O <br /> i <br /> IF REQUIRED BT SLAB REMOVAL CODES AND GOVERNING AUTHORITIES. <br /> (TYP 4—PLCS.) 2. ALL MONITO�ING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 11 <br /> -- <br /> 3. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AS REQUIRED BY <br /> LOCAL AGENICY, AND PERMIT CONDITIONS: SEAL: <br /> A, PRIMARY' PIPING PNEUMATICALLY TESTED FOR 30 MINUTES. Q�O�ESS!pNq�� <br /> ' N <br /> B. INSPECTTION OF ALL SECONDARY CONTf_INMENT, INCLUDING TESTING, IN ACCORDANCE WITH <br /> MANUFAICTURER'S GUIDELINES. C �y <br /> C. ANY OTHER TEST REQUIRED BY PERMIT CONDITIONS HAL P. GRUBB <br /> 4. ALL NEW UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LAKE TEST) WITH STANDING WATER TO <br /> rm <br /> INSTALL NEW CONCRETE --jTOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. RECORD THE TEST ' 67814 <br /> DISPENSER ISLANDS AND RESULTS AND SUBMIT TO OWNER. <br /> 2 5 NEW UNDER DISPENSER 5. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION ,�/ <br /> 6 CONTAINMENT SUMPS WITHIN 30 DAYS OF THE FINAL INSPECTION. 6 30 �''!, <br /> s / / Q <br /> (TYP. 8 LOCATIONS) 6, TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING �9T C V I <br /> CanopyAGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. FFS. <br /> OF C4\ 00 <br /> CANOPY ABOVE 7, PRIOR TO FUIEL BEING PUMPED, STATION MUST HAVE VEEDER ROOT FUNCTIONAL AND MONITORING ANNULAR SPACES <br /> OF TANK <br /> AND DISPENSER SUMPS. <br /> = i <br /> CONFIDENTiALITIf„STATEMENT 3 <br /> 8. REFERENCED CODES SHALL INCLUDE 2007 CBC; 2007 CFC, ARTICLE 7 , 2007 CEC; 2007 CMC. COP DE METERLS MATERIALS EODevSapNpNo nLsa, w <br /> C C 9 C. RECIPIENT <br /> ,...: .. ... 7H A A WN <br /> SEE ? T 9. FIRE SAFETY DURING CONSTRUCTION SHALL FOLLOW 2001 CFC ARTICLE 87. FIRE EXTINGUISHERS SHALL BE PROVIDED. THE AUTOMATIC s RETIAL <br /> THAT THETMA7ERiALS CONTAIN PRIVILEGED AND CON Cl <br /> BUSINESS INFORMATION OF BP. ACCORDINGLY, THE Of <br /> RECIPIENT AGREES TO RETAIN THESE MATERIALS IN m <br /> CONFIDENCE ANI) AGREES NOT TO DISCLOSE THESE <br /> FIRE SPRINKLER SYSTEM IS TO REMAIN IN SERVICE AT ALL TIMES. UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER SYSTEM BE MATERIALS ro ANY OTHER PARTY AND FURTHER Ac�Ees a <br /> LEFT OUT OF SERVICE OVERNIGHT. 0'.T NOT TO MAKE COPIES OF THE MATERIALS. THE RECIPIENT <br /> AGREES TO USE THE MATERIALS ONLY FOR THE LIMITED <br /> ............. PURPOSE FOR WHICH BP HAS MADE THE MATERIALS <br /> AVAILABLE, AND RECIPIENT AGREES TO RETURN ALL <br /> I- MATERIALS TO 8P EITHER UPON COMPLETION OF THE <br /> SEWER y INTENDED PURPOSE OR UPON THE REQUEST OF LIP, <br /> X <br /> k <br /> SUMP <br /> REINSTALL EXISTING GILBARCO <br /> BH-1 DISPENSERS. INSTALL WITH WHICHEVER COMES FIRST. <br /> l -SIGN DISCLAIMER: <br /> WITH NEW UNDER DISPENSER PIPE AND TAUK D-_ <br /> DRY SUMP CONTAINMENT SUMPS, SHEAR BP DOES NOT AND CANNOT WARRANT THAT THE PLANS FOR g <br /> -- <br /> PETROLEUM STORAGE AND DISPENSING ARE COMPLIANT WTIi 7) <br /> I LOT LIGHT VALVE AND PENETRATION FITTINGS. <br /> ALL LEGAL REQUIREMENTS THAT EXIST OR AS THEY MAY BE <br /> APPLREUSE EXISTING CONTAINMENT 36'-3" <br /> DRY SUMP FUFILING STORAGE ANDS PLANS SYSTEM CONSTRUCTED ED IN THE FUTURE. NOR DOES BP WARRANT TIN <br /> PIPING INTO NEW CONFORMITY WITH THESE PLANS WILL DE FREE OF ALL <br /> IV <br /> SUMP SENSORS AND HANGING q EXTEND i D LEAKS. YOU ARE ACCORDINGLY STRONGLY ENCOURAGED TO <br /> �p'' <br /> SUMPS CONSULT W A FUELINGAT <br /> RN HARDWARE (TYP. OF 8) <br /> CHOOSING To INDEPENDETLY EVALUATENWHE HER YOUR <br /> n4 <br /> ,, �l .�� �' ................ ..,..... .............._...-.--._ .........._..... ...__...._- STORAGERAND D LIVERYPLANS TRULY (SYSTEM ATOYOUR STATION.THE <br /> FOR <br /> XI <br /> R-9�' DEVELOPMENT INFORMATION: <br /> —�� .. ........... .... ....... TELEPHONES <br /> �— <br /> SEWER <br /> SUMP <br /> ._._._......_..... . <br /> PIPE UNDERGROUND UN GE 6 <br /> : ...; STORAGE 6 <br /> BOLLARD LOT <br /> LIGHT TANK STANDARDS <br /> TANDARDS <br /> _ .914 <br /> I.D. SIGN <br /> a <br /> O SB 989 SUMP REPLACEMENT co <br /> co <br /> - -� <br /> ;r*0 <br /> q <br /> U G <br /> O <br /> S _ _. <br /> ..-_.._. SITE ADDRESS. <br /> 0 <br /> yR <br /> J�� o <br /> 1711 E YOSEMITE <br /> nn . <br /> MANTECA, CA <br /> �7 <br /> YO _ <br /> S <br /> MIT <br /> VD. FACILITY No. 06020 <br /> STq� DESIGNED BY: JP/OV ALLIANCE ZdcDM: F <br /> HWY. CD <br /> 120) <br /> CHECKED BY: OV BP REPM: o <br /> DRAYMN BY: iP ALLIANCE PM: <br /> U <br /> VERSION: PROJECT <br /> NO-0 <br /> BCE #3518 01 <br /> DRAWING TITLE: � <br /> E <br /> a <br /> DISPENSER SUMP REPLACEMENT <br /> AND PIPING REPAIR SITE PLAN <br /> PROPOSED SITE PLAN DRAWING DISCLAIMER NOTE AOMD INFORMATION " <br /> 0 5 10 20y <br /> SCALE: 1"=1(0'-0" Call Toll Free THIS SITE PLAN HAS BEEN PREPARED WITHOUT BENEFIT OF TITLE REPORT, NO. FUELING POSITIONS: 8 SHEET NO: <br /> 1 X888} 258`0808 SURVEY, OR LEGAL (DESCRIPTION. BARGHAUSEN CONSULTING ENGINEERS NO. GASOLINE NOZZLES: 16 8 <br /> DOES NOT WARRANT THE ACTUAL LOCATION OF PROPERTY LINES AND NO. DIESEL NOZZLES; 0 <br /> TWO SETBACKS. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO <br /> WORKING DAYS VERIFY PROPERTY LfINES AND SETBACK DISTANCES WHERE THEY MAY / <br /> BEFORE YOU AFFECT THE PLACEMIENT OF NEW EQUIPMENT AS A PART OF THIS PROJECT. LO <br /> DIG THE DRAWING REFLEi'CTS EXISTING SITE CONDITIONS AS PROVIDED BY BP i <br /> FROM ARCHIVE RECO}RDS. TK1 <br /> l 00 <br /> O <br /> 0 <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.