Laserfiche WebLink
D- Results of Testing/Servicing <br /> Software Version Installed: Z �� <br /> Com fete the following checklist: <br /> Yes Cl No' Is the audible alarm operational? <br /> Yes No' Is the visual alarm operational? <br /> y. Yes L' No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> Yes No' Were all sensors Installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br /> proper operation? <br /> / Yes !_i No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g,modem)operational? <br /> N/A <br /> / Yes No' For pressurized piping systems, does the turbine automatically shut down If the piping secondary containment monitoring system <br /> N/A detects a leak,fails to operate,or is electrically disconnected? If yes:which sensors initiate positive shut-down? (Check all that apply) <br /> / Sump/Trench Sensors; / Dispenser Containment Sensors. Did you confirm positive shut-down due to leaks and sensor <br /> failure/disconnection? %Yes; No. <br /> Yes No' For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br /> N/A valve Is Installed),is the overfill warning alarm visible and audible at the tank fill poini(s)and operating properly? If so,at what percent <br /> of tank capacity does the alarm trigger? <br /> / Yes' No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> / Yes' No Was liquid found Inside any secondary containment systems designed as dry systems? (Check all that apply)i.1 Product; :Water. If <br /> es,describe causes In Section E,below. <br /> Yes 1 No' Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,it applicable <br /> �t Yes n No' Is all monitoring equipment operational per manufacturer's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of a 12/07 <br /> 2 <br />