My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2008 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 4:03:53 PM
Creation date
5/4/2020 9:32:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2009
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: I; Check this box if tank gauging Is used only for inventory control. <br /> L I Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lets the followlng checklist: <br /> Yes E No- Ujis4f input wiring been Inspected for proper entry and termination,including testing for ground faults? <br /> Yes FI No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes o' Was accuracy of system product level readings tested? <br /> Yes I I No. Was accuracy of system water level readings tested? <br /> es No` Were all probes reinstalled properly? <br /> Yes No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): I Check this box if LLDs are not installed. <br /> Com fete the following checkllst: <br /> Yes i No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check all <br /> i N/A that apply) Simulated leak rate:/3 g.p.h.; 6.1 g.p.h; 0.2 g.p.h. <br /> Yes No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No' Was the testing apparatus properly calibrated? <br /> Yes !I No, For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 11 N/A <br /> Yes F1 No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ,♦d N/A <br /> Yes r; No' For electronic LLDs, does the turbine automatically shut off it any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> Yes No' For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> Yes 1 No` For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> Yes No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.