My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
OAK
>
2478
>
2900 - Site Mitigation Program
>
PR0541551
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 12:33:18 PM
Creation date
5/4/2020 12:18:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541551
PE
2965
FACILITY_ID
FA0023821
FACILITY_NAME
FORMER ARCO #443
STREET_NUMBER
2478
Direction
E
STREET_NAME
OAK
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14124023
CURRENT_STATUS
01
SITE_LOCATION
2478 E OAK ST
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
231
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Page 2 of 3 <br /> the proposed addendum. <br /> Sincerely, <br /> Brian Westhoff <br /> Senior Geologist <br /> Stantec <br /> 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> Ph: (916)861-0400 Ext.270 <br /> Fx: (916)861-0430 <br /> Cell:(916)412-2459 <br /> brian.westhoff@stanter.com <br /> stantec.com <br /> The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted,or <br /> used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all <br /> copies and notify us immediately. <br /> (,0 Please consider the environment before printing this email. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, July 28, 2008 4:21 PM <br /> To: Westhoff, Brian <br /> Subject: ARCO 443 <br /> Brian, <br /> I got a chance to look over your July 10th TRAP.. <br /> although I'm NOT a big fan of monthly GWE/batch from a well (monitoring) <br /> NOT designed for production, I've decided to go ahead and ok it for now and <br /> watch and see how effective it is over a few months, assuming I get an <br /> understanding of HOW much water you plan on pulling out each month. My <br /> experience has shown MWs do not produce much and I've yet to see any RP <br /> meet substantial quantities or results in 6-12 months.... <br /> get me a narrative and well schematic (diagram) of the cased MW-8. I'll need to <br /> see borehole sizes and material ID and OD diameters, materials, centralizers, <br /> timetable, etc before I can approve the Plan. <br /> By all means, I should DENY this GT submittal so you can re-submit a revised <br /> one that includes these concerns. <br /> Michael J. Infurna Jr. <br /> Senior REHS. CA Reg #5649 <br /> LOP / Site Mitigation Unit IV <br /> San Joaquin County Environmental <br /> Health Department(SJCEHD) <br /> 600 E. Main Street <br /> Stockton, CA. 95202-3029 <br /> office: (209)468-3454 <br /> 8/8/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.