Laserfiche WebLink
• <br /> Stantec <br /> Interim Remediation Action Plan <br /> Former ARCO Service Station No. 443 <br /> July 10, 2008 <br /> 3.0 Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP affiliated company, for the express purpose stated <br /> above. Any re-use of this report for a different purpose or by others not identified above shall be <br /> at the user's sole risk without liability to Stantec. To the extent that this report is based on <br /> information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information, but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation. No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prepared by: Reviewed by: <br /> R�Clark Brian Westhoff <br /> Staff Geologist Senior Geologist <br /> Information, conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Approver: ?, pOESSio/v <br /> 4, <br /> yQ-J'l 0 Z <br /> G2t, C 583 ^ <br /> Rusty Benkosky E. <br /> Principal Engin er EXP.121 112008 <br /> July 10, 2008sTgrFpclviL <br /> cc: Mr. James Barton, Regional Water Quality Control Board - Central Valley Region <br /> Mr. Sergio Morescalchi,ARC (Upload to Enfos) <br /> Upload to Geotracker <br /> 6 <br /> 4431RAP.doc <br />