My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2900 - Site Mitigation Program
>
PR0542364
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 3:40:49 PM
Creation date
5/4/2020 3:01:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0542364
PE
2960
FACILITY_ID
FA0024340
FACILITY_NAME
PACIFIC CAR WASH
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024014
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
460
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hi Tim, <br /> I am the new caseworker for 4405 Pacific Avenue, Stockton. I am reviewing the Soil-Vapor and Groundwater <br /> Remediation Report First Quarter. If I may have clarification on the following I would appreciate it: <br /> • The report says the remedia Jon system was in operation 11 hours per day. Looking at the performance data in <br /> Table 4, 1 am not calculating the same number of hours in a given time range as compared to the operation <br /> hours presented in the table For example, between 18 Dec. 2013 and 27 Jan. 2014,the table states 353.8 hours <br /> of operation occurred. However,that time frame is approximately 41 days and multiplying this by 11 hours gets <br /> me 451 hours. For 27 Jan.— Li Feb. (plus 1 hour on 24 Feb.) is about 16 days,times 11 gets me 178 hours(yet <br /> the table says 139.1). <br /> o As a related side noe,the narrative on page 4 of 9 also refers to these operation hours, saying that <br /> between Dec.2013id Feb. 2014,total hours of operation is 139.1 (which does not agree with table 4). <br /> • The temperature for the system's catalytic mode has readings of 650 degrees Fahrenheit consistently since <br /> 8/2/2012-1/3/2014. Does the temperate gauge max out at 650? <br /> • Temperature dropped to 274 degrees Fahrenheit down to the mid 100's in the first quarter 2014. What was <br /> the reason for this? <br /> Also, may you please send me the raw data for these events?Technician field logs, readings, ect... <br /> Thank you, <br /> Gabriel Gonzalez <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.