Laserfiche WebLink
fa <br /> t <br /> SITE SAFETY PLAN <br /> SOIL EXCAVATION AND SAMPLING <br /> ARCO Service Station No. 6100 <br /> 25775 South Patterson Pass Road <br /> Tracy, California <br /> (July 27, 1990) <br /> INTRODUCTION <br /> This Site Safety Plan describes basic safety requirements nor the subsurface environmental r <br /> investigation. The provisions set forth in this Pian apply to the employees of Roux <br /> Associates and its subcontractors working on this phase of the project. The subcontractors <br /> may elect to modify these provision,but only to upgrade or increase the safety requirements, <br /> and only with the concurrence of Roux Associates, as designated and accepted in writing. <br /> This Site Safety Plan will address the expected potential hazards that may be encountered <br /> on the worksite for this project. Field activities are planned to begin pending approval of <br /> the Work Plan for Soil Excavation and Sampling by San Joaquin County. If changes in site <br /> or working conditions occur as activities progress, addenda to this plan will be provided by <br /> k Roux Associates. <br /> AUTHORITY FOR SITZ; SAFETY <br /> Y <br /> The Roux Associates personnel responsible for project safety are the Project Manager amd <br /> t the Staff Geologist or Engineer. The Health and Safety Coordinator is responsible for the <br /> overall Roux Associates Health and Safety Program and may choose to audit the site for <br /> i compliance and take appropriate action to correct deficiencies. "-Che Project Manager is T <br /> responsible for implementing the provisions of this Plan, for providing a copy of this Han <br /> to the Staff Geologist or Engineer, and for advising the Staff Geologist or Engineer on i <br /> health and safety matters. The Project Manager and Staff Geologist or Engineer have the <br /> authority to audit site activities for compliance with the provisions of this Plan. They may <br /> suspend or modify work practices or dismiss subcontractors whose conduct does not meet <br /> the requirements specified in this Plan. <br /> T The Staff Geologist or Engineer is responsible for communicating the information contained <br /> " in this Plan to the Roux Associates personnel assigned to the project and to the responsible <br /> representative of each subcontractor working for Roux Associates on the project. <br /> 1 <br /> i <br /> e <br /> 1 Doc#AR067677VILI <br /> f <br /> I MINN-igloo MIN"I <br />