My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012613
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0012613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:31:28 PM
Creation date
5/4/2020 4:20:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012613
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> 5 <br /> P,y <br /> Site safety Plait lady 27, IMI <br /> ARCO Station No, 6104, Tracj; Calijontia <br /> The Staff Geologist or Engineer will also act as the Site Safety Officer. As such, the Staff <br /> Geologist or Engineer is responsible for addressing the following items: <br /> o Implementing the Site Safety Plan, Company policy, and procedures <br /> 0 Requiring and maintaining adequate,safety supplies and equipment inventory <br /> onsite <br /> i } <br /> i 0 Conducting daily safety meetings and advising workers regarding hazards s <br /> !w o Site control, decontamination, and contamination-reduction procedures <br /> o Reporting accidents or incidents <br /> The Staff Geologist or Engineer has the authority to suspend work any time he or she finds <br /> that the provisions of the Plan are inadequate for worker safety. The Staff Geologist or <br /> Fngineer will inform the Project Manager and the Health and Safety Coordinator promptly <br /> of deficiencies within the Plan or individuals or subcontractors whose conduct is not <br /> consistent with the requirements of the PIan. <br /> .i MEDICAL SURVEILLANCE <br /> ! Roux Associates personnel and subcontractors engaged in project activates must participate <br /> in a medical surveillance program and must be cleared by the examining physician(s) to <br /> wear respiratory protection devices and protective clothing for working with hazardous <br /> materials. The applicable requirements of Title 8, Section 5216, of the Qa1Jf rrii <br /> i Administrative Code will be observed. The appIiczble requirements under 29 CFR <br /> 19109.120 of the Federal Admini5tra ive Code will also be observed. <br /> SAFETY ANF` ORIENTATION MEETING <br /> _ Field personnel from Roux Associates and its subcontractors will attend a project-specific <br /> training meeting for safety issues and review the project tasks before beginning work. The <br /> meeting wiII be led by the Project Manager or Staff Geologist or Engineer. In addition,fit- <br /> testing of respiratory protective devices will be conducted as part of the safety orientation <br /> meeting when the use of respirator may be required. <br /> f <br /> 1 <br /> 2 Doc#AR06767 V LI <br /> rl� <br />
The URL can be used to link to this page
Your browser does not support the video tag.