My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012613
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2900 - Site Mitigation Program
>
PR0543467
>
ARCHIVED REPORTS_XR0012613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2020 4:31:28 PM
Creation date
5/4/2020 4:20:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012613
RECORD_ID
PR0543467
PE
2960
FACILITY_ID
FA0024672
FACILITY_NAME
FORMER ATLANTIC RICHFIELD CO (ARCO) NO 6100
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS
P_LOCATION
03
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rli'510! 111ill:: 111111 Qil:iii <br /> Limited Environmental Investigation May 15, 1990 <br /> ARCO Service Station 6100, Tracy, California AGS 30041-IW <br /> collected at 30 feet below grade, we will drill until (1) two consecutive samples collected <br /> at 5-foot intervals show PID readings of Iess than 50 ppm or(2) until we encounter ground ; <br /> water o:auger refusal. Other additional subjective evidence of gasoline hydrocarbons such <br /> as soil discoloration or obvious odor will be noted. <br /> S <br /> If the first boring is terminated above 30 feet below grade,three additional 8-inch-diameter <br /> i <br /> soil borings will be drilled approximately 2-1/2 feef from the edge of the tank area equally . <br /> f <br /> -� spaced around the tank perimeter. If the first boring is drilled deeper than 30 feet, then <br /> y <br /> two additional borings will be using the above criteria. A boring will not be drilled <br /> .. on the opposite end from the fill ports. <br /> i <br /> { An additional two soil borings will be drilled to approximately 20 feet in the area where the s <br /> new tank cavity may be excavated. This proposed tank cavity area is,shown i,n Plate P-2: <br /> '® a <br /> J <br /> Collecting oil Samples <br /> During drilling,soil samples will be collected at 5-foot or other appropriate intervals using <br /> . •- a California-modified, split-spoon sampler equipped with clean brass sleeves. Samples will z <br /> 'r <br /> be collected by drilling the boring to a point just above the sampling depth and then driving . <br /> the sampler into the soil through the hollow center of the auger. The sampler will be <br /> 8 <br /> Applied GeaSyetelfls <br />
The URL can be used to link to this page
Your browser does not support the video tag.