Laserfiche WebLink
sampled due to the presence of floating product The other vapor and monitoring wells were <br /> either dry or could not be sampled due to poor well recovery <br /> 3 Stratus prepared and submitted a permit to operate (PTO) cancellation letter (dated December <br /> 21, 2004) requesting cancellation of permits for the two King, Buck, and Associates, Inc, SVE <br /> systems <br /> 4 ARCO procured a new Solleco 500 cubic feet per minute (cfm)thermal oxidizer with a 40 hp liquid <br /> ring blower to replace the two King, Buck, and Associates, Inc , SVE systems <br /> 5 Stratus removed the two 200 cfm King, Buck, and Associates, Inc, SVE systems from the site <br /> 6 Stratus compiled and evaluated the fourth quarter 2004 monitoring and sampling data <br /> WORK PROPOSED FOR NEXT QUARTER(First 2005) <br /> 1 Stratus will continue to remove floating product, if present, from wells MW-1, MW-15, VW-1, and <br /> VW-4 on a weekly basis <br /> 2 The next sampling event is tentatively scheduled for March 2005 Groundwater samples will be <br /> analyzed for gasoline range organics (GRO), benzene, toluene, ethylbenzene, total xylenes (BTEX), <br /> tertiary butyl alcohol (TBA), methyl tertiary butyl ether (MTBE), di-isopropyl ether (DIPE), ethyl <br /> tertiary butyl ether (ETBE), tertiary amyl methyl ether (TAME), 1,2-dichloroethane (1,2-DCA), <br /> 1,2-dibromoethane (EDB), and ethanol using USEPA Method 8260B <br /> 3 Stratus will prepare and submit an authority to construct (ATC) application for the new Solleco 500 <br /> cfm thermal oxidizer <br /> 4 Stratus will prepare and submit a letter report documenting the details associated with replacement <br /> of the remediation equipment Stratus will retain an electrical contractor to make electrical <br /> connections for the new Solleco 500 cfm thermal oxidizer Stratus will also retain a propane vendor <br /> to install and provide propane service required for the thermal oxidizer <br /> 5 Stratus will conduct bi-monthly site visits to monitor system performance, maintain equipment, and <br /> to collect compliance samples <br /> Current Phase of Project Monitoring/Remediation <br /> Frequency of Groundwater Sampling All Monitoring Wells=Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Sampling Date December 20, 2004 <br /> Is Free Product(FP) Present on Site Yes(MW-1, MW-15,VW-1, and VW-4) <br /> FP Recovered This Quarter 11 gallons <br /> Cumulative FP Recovered to Date 216 gallons <br /> Depth to Groundwater(Upper) 34 05 to 65 38 feet below ground surface (bgs) <br /> Groundwater Flow Direction (Upper) South <br /> Groundwater Gradient(Upper) 0 091 ft/ft <br /> Depth to Groundwater(Lower) 92 88 to 106 70 feet bgs <br /> K\13p-Arco for UR516100IQuarterly120041Arco_6100_4Q04 doc STRA7I15 <br />