Laserfiche WebLink
. Groundwater Flow Direction (Lower) East-southeast <br /> Groundwater Gradient(Lower) 0 036 ft/ft <br /> SVE QUARTERLY OPERATION AND PERFORMANCE <br /> Equipment Inventory Two 200 cfm King, Buck&Associates SVE Systems[SL Nos <br /> 9321 (Unit 1) & 9230 (Unit 2)] until fourth quarter 2004 New <br /> Solleco 500 cfm thermal oxidizer to replace these units during <br /> first quarter 2005 <br /> Extraction Wells VW-6, VW-8, VW-9, &MW-9 connected to Unit 1 <br /> VW-1, VW-14, MW-3, & MW-7 connected to Unit 2 <br /> Operating Mode Unit 1 shut down September 30, 2004 pending replacement <br /> Unit 2 shut down November 11, 2004 pending replacement <br /> Required Permits San Joaquin Valley Air Pollution Control District(Permit Nos <br /> N-5026-1-0& N-5026-2-0 <br /> GRO Conc End of Period [Unit 1] Not Operational <br /> GRO Conc End of Period [Unit 2] 2,200 mglm3(total influent) <br /> Benzene Conc End of Period[Unit 1] Not Operational <br /> Benzene Conc End of Period [Unit 2] 38 mg Im3 total influent <br /> MTBE Conc End of Period[Unit 1] Not Operational <br /> . MTBE Conc End of Period[Unit 2] <5 0 MQ/M3 total influent <br /> Average Flow Rate This Period [Unit 1] Not Operational <br /> Average Flow Rate This Period [Unit 2] 123 66 scfm <br /> Applied Vacuum This Period[Unit 1] Not Operational <br /> Applied Vacuum This Period [Unit 21 10 inches water column <br /> HC Destroyed This Period (lab) 636 71 lbs as GRO from both units <br /> Cumulative HC Destroyed 9,625 lbs as GRO from both units <br /> Number of Auto Shutdowns Unit 1 was non-operational during fourth quarter, Unit 2 had <br /> one strut down, and system completely shut down November <br /> 11, 2004 <br /> DISCUSSION <br /> Upper Water Bearing Zone Sand Zone 1 <br /> During the site visit conducted on December 20, 2004, approximately 4 gallons of product/water mixture <br /> were manually bailed from wells VW-1 and VW-4, and stored In a properly labeled DOT-approved drum <br /> pending disposal Approximately 18 gallons of producttwater mixture has been manually bailed to date <br /> Product thickness measurements and volumes of liquid bailed are summarized in Table 1 <br /> At the time of the fourth quarter 2004 monitoring event, groundwater levels had decreased between 0 21 <br /> and 2 57 feet In wells MW-2, MW-13, and VW-1, and increased between 2 47 and 6 03 feet in wells VW-2 <br /> through VW-6, since the previous monitoring event (September 6, 2004) Depth-to-water measurements <br /> were normalized to mean sea level (MSL) and used to construct a groundwater elevation contour map <br /> (Figure 3) Wells that contained less than 1 foot of water are interpreted to be dry and are indicated as <br /> "dry" on Figure 3 Because wells VW-1 and VW-6 are screened In a shallower interval than the other <br /> K\Bp-Arco for URS\6100\Quarterly\2004\Arco_6100_4Q04 doc 5rmiv5 <br />