My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:58:34 AM
Creation date
5/5/2020 9:11:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I, <br /> Meeting Agenda <br /> Canepa's Car Wash <br /> 6230 Pacific Avenue, Stockton <br /> December 2007 <br /> Participants <br /> Remo Canepa Ron Skaggs Frank Girardi <br /> Jeff Canepa Don Kresse <br /> I. Meeting Purpose <br /> A. Discuss the site history through present. <br /> B . Why we' re concerned. <br /> C. Options. <br /> D. Recommendations. <br /> H. Brief Site Background <br /> A. Three USTs removed and contamination was discovered (1993). <br /> B . Nine SVE wells installed around fuel dispenser islands ( 1993). <br /> C. Four monitoring wells (MW- 1 through MW-4) installed (1993). <br /> D. Internal combustion unit installed/operated (1993 - 1995) . <br /> E. 24-hour pump test ( 1994). <br /> F. Four monitoring wells (MW-5 through MW-8) installed ( 1994). <br /> G. Quarterly groundwater monitoring (1994 - present) . <br /> H. Approximately 13 ,000 pounds of hydrocarbons estimated to be present in site soil <br /> based on soil analytical data (Condor, 1996). <br /> I. 150 SCFM catalytic oxidation unit installed, SVE system began operation (1999). <br /> J. Sensitive receptor survey conducted (2001 ). <br /> K. Four monitoring wells (MW-9 through MW- 12d) installed (2001). <br /> L. SVE system upgraded with two 1 ,000-pound vapor phase carbon vessels (2002). <br /> M. Monitoring well MW-8 destroyed (2003). <br /> N. Groundwater extraction and treatment began (2004). <br /> CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.