Laserfiche WebLink
C=epa's Cu Wash <br /> Pre-Approval Request - <br /> Jme I13 2001 <br /> Page -2- <br /> On behalf of Mr.. Remo Canepa, Condor respectfully requests that the three-bid requirement for <br /> consulting services be waived. The three-bid waiver is requested in the interest of timeliness due to the <br /> project expediency required by the PHS/EHD and because Mr. Canepa has confidence that Condor can <br /> provide the required services in a timely, professionally competent, and cost-effective manner. If you <br /> have any questions regarding any of the documentation in this pre-approval package please do not <br /> hesitate to contact me at (209) 234-0518. <br /> Respectfully Submitted, <br /> CONDOR EARTH TECHNOLOGIES, INC. <br /> 7 tt <br /> ro' ct Manager <br /> Attachments <br /> cc: Mr. Remo Canepa <br /> Ms. Dot Lofstrom, PHS/ESD <br /> \\Pdc\projects\1707 Caaepa-Pacific/Reimbursemmt\Ltrpm5-29-Ol .doe <br /> I� <br />