Laserfiche WebLink
JAN- 12 90 10 : 06 FROM: CONDOR TIIRLOCR: 209-660- 9240 TO : 46401.571707 PAGE : 02 <br /> January 12, 1996 <br /> Mr. Remo Canepa <br /> Canepa's Car Wash <br /> 1536 N . Hunter St. <br /> Stockton, CA 45202 <br /> Re: 6324) .Paeific Street, Stockton, <br /> Dear Mr. Canepa: <br /> The purpose of this letter is to doconent several requests that were made by Mr. Ron Rowe (if the San <br /> Joaquin County Public Heath Services Environmental health Division (PHS/EHD) in a meeting held on <br /> December 19, 1997 and during subsequent telephone conversations. During the meeting Mr. Rowe <br /> requested that die following tacks be conducted; <br /> Task 1 . Installation of the interim soil vapor extraction (SVE) system as quickly and efficiently as <br /> possible. Both Mr. Rowe and Condor are confident that, based up oil the diselunrge of the <br /> previous SVE system and the site geology, the interim SVE system will effectively remove <br /> significant levels of hydrocarbons from the vadose zone and the groundwater. <br /> Task 2 . Prepare a work plan for the installation and sampling of two soil borings and for the <br /> installation of up to four additional monitor wells. In addition, the repair of four monitor well <br /> traffic boxes will be included in the Work Flan. The work is discussed in `Casks 3, 4, and 5, <br /> below <br /> Task 3 . Install two soil borings_ The soil borings will be installed to meet the provisions of the <br /> California Underground Storage Tank Clean-Up Fund (UST-CF) for pre-approval of corrective <br /> action costs. The provisions were included in the 1JST-CF letter to you, dated October 23 , <br /> 1997 . One boring is to be located within the SVE well array, to investigate current contaminant <br /> /soil plume conditions. The second boring will be located to the northeast. of the SVE well array <br /> ��{ C and be used to investigate soil and grcmndwater conditions in the down gradient direction. The <br /> borings will most likely lx: advanced to at least 70 feet below the ground surface. Boil and <br /> groundwater samples will be collected simultaneously in the saturated zone at five foot intervals <br /> s a Simulprobe sampling device. Information gained from the boring will be used to <br /> � It �k effectiveness of the interim SVE ,+ystem currently being installed at the site and <br /> 6t�� h�MJ 5 . a'Aij� designing the additional monitor wells discussed in Task 4. <br /> SaSt�G Task 4. PlyiJnsstall up to four additional nnotnitor wells at the site. The wells will be placed at the perimeter <br /> of the contaminate plume to assist in evaluating MTBF migration at the Bite. The additional <br /> wells are also required because the groundwater table has risen above the top of the screened <br /> interval in all of the existing wells, rendering analytical data from samples of the existing wells <br /> potentially inaccurate. <br />