My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 9:58:34 AM
Creation date
5/5/2020 9:11:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
613
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SRN- 12 90 10 : 07 FROM : Cr NDOR TURLOCK. 209-666-9240 T7 : 46401.381707 PAGE 0--3 <br /> o <br />` Mr. Rcmo Cancra <br /> January 12, 1998 <br /> Page 2 <br /> The additional wells will be constructed so that the groundwater table straddles the screened <br /> interval. Provisions will also be made to complete two of the wells as a nested set, allowing <br /> sampling of two water bearing zones in the same location_ The wells will allow <br /> characterization of the vertical component of groundwater contamination. <br /> Task 5 . Replace three monitor well traffic boxes. MW-25 MW -3 , and MW-4 need to be replaced due <br /> to tailing concrete. The work is described in letter dated October 23, 1997, from Condor to the <br /> PHSlEHD. <br /> Upon your approval of a contract addendum, Condor will prepare the work plan for submission to the <br /> PHS/81-LD. Following approval by the PM/E11D, a cost estimate for Tasks 3, 4, and 5 will be prepared <br /> and submitted for pro approval to the Clean- up fund. <br /> 1 would also appreciate it if you would review the Fourth Quarter Monitoring Reports, for both of the <br /> sites, as Soon as possible, so that 3 may forward them to the PHS/ETit] and the RWQCS-CVR. The next <br /> Quarterly Monitoring event is scheduled for a little later this month . <br /> Please call me to get the this phase of the work underway. The permits from the Air Board should be <br /> completed soon and we should get the interim SVE system operational as soon as possible. If you have <br /> any questions or need any additional information please call me at (209) 668-9234. <br /> Sincerely, <br /> R. David Meade <br /> Project: Geologist <br /> H ' <br /> cc: Rau Itawe, Sao Joaquin P SIEHD <br /> Chuck Arnold, US-1 -CF <br /> t[tizabeth Thayer, R WCXal-C VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.