Laserfiche WebLink
9'? <br /> WHFEnvironrnental C ultants, Inc. ' <br /> Health & Safety Plan <br /> Page: 3 <br /> 2.0 SAFETY IMPLEMENTATION <br /> > The provisions of. the WHF Environmental Consultants, Inc. Health and Safety Pian <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete bac ! <br /> p background review and site visitation will be conducted in order to deter- <br /> Ism mine whether specific amendments are to be made to the Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> ` associated with the on-site operation which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices- <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site layout has built-in safety features. The site is divided into <br /> three zones. The followinglist defines the <br /> required personnel protective equipment. <br /> } <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be worlang in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> Project Manager: <br /> Coveralls as an undergarment <br /> - <br /> �• Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boats <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges (a combination of j <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br />