My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012931
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6230
>
2900 - Site Mitigation Program
>
PR0543479
>
ARCHIVED REPORTS_XR0012931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 10:08:26 AM
Creation date
5/5/2020 9:57:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012931
RECORD_ID
PR0543479
PE
2960
FACILITY_ID
FA0024679
FACILITY_NAME
CANEPA'S CAR WASH
STREET_NUMBER
6230
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
081360030
CURRENT_STATUS
01
SITE_LOCATION
6230 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9'? <br /> WHFEnvironrnental C ultants, Inc. ' <br /> Health & Safety Plan <br /> Page: 3 <br /> 2.0 SAFETY IMPLEMENTATION <br /> > The provisions of. the WHF Environmental Consultants, Inc. Health and Safety Pian <br /> are mandatory for all personnel associated with the site project and operations. <br /> A complete bac ! <br /> p background review and site visitation will be conducted in order to deter- <br /> Ism mine whether specific amendments are to be made to the Health and Safety Plan based <br /> on specific characteristics which may exist on the job site. Any suspected hazards <br /> ` associated with the on-site operation which exposure to, via inhalation or skin absorp- <br /> tion, to such as suspected carcinogens or human sterilants, will be documented and <br /> specific guidance will be developed and added to this Health and Safety Plan as <br /> Appendices- <br /> A defined project site layout is paramount to the safe completion of all remedial site in- <br /> vestigations. The project site layout has built-in safety features. The site is divided into <br /> three zones. The followinglist defines the <br /> required personnel protective equipment. <br /> } <br /> 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be worlang in or around the exclusion zone of the job site <br /> will use the following protective equipment and measures as warrant by the <br /> Project Manager: <br /> Coveralls as an undergarment <br /> - <br /> �• Saranex outer garment <br /> - Sample gloves (inner) <br /> - PVC, Nitrile or Neoprene outer gloves <br /> - Hard hat <br /> - Steel toe boats <br /> - Robars or Tingley boots <br /> - Full face-piece respirator with R53HE cartridges (a combination of j <br /> organic vapor, acid gas, pesticide, radionuclide, high efficiency filter). <br /> Note that cartridges should be changed daily. <br /> - All joints to be taped <br /> - Self-contained air will be utilized if project dictates <br />
The URL can be used to link to this page
Your browser does not support the video tag.