Laserfiche WebLink
January 29, 1996 <br /> Page 2 <br /> The system was shut down after sampling was completed, pending receipt of a Permit to <br /> Operate (PTO) from the SJVUAPCD. We ask that you please'expedite issuance of the <br /> PTO for this system as Unocal is eager to restart the system and proceed with active <br /> remediation of the site. <br /> If you have any questions or require any addition information, please do not hesitate <br /> to contact me at (408) 441-7500. <br /> Sincerely, <br /> Pacific Environmental Group, Inc. <br /> Andrew D. Lehane <br /> Project Engineer <br /> • I <br /> Attachments: Table i - Soil Vapor Extraction System Start-Up Results <br /> Attachment A - Certified Analytical Reports and Chain-of-Custody <br /> Documentation <br /> cc: Mr. Bob Boust, Unocal Corporation <br /> I <br /> i <br /> 3100405A/SOURCE <br />