Laserfiche WebLink
' Work Plan for Additional Subsurface Assessment_Former,Unocal Station#2859 <br /> _ - March 6,2001 s. <br /> Drill cuttings will•be stored at the site pending receipt of�c' emieal analytical data for disposal .The drtlF , <br /> cuttings will be stockpiled on.and covered,with plastic sheeting. =Four discrete-soil samples wilt be . <br /> • collected from the drill cuttingsfor disposal.characterization.a`s-described.in.AppendixA.' These samples , ' <br /> will be submitted to the Jaboratory.for•compositing and.analysis,.and will be-,analyzed:as.described in <br /> - <br /> Task.5.. Stockpiled soil and,,steam cleaning' -rinsate will.be transported'fo'r disposal-at"an appropriately" <br /> licensed facility. :- <br /> Task 3.r, Well Development and Sampling' 1 <br /> ^ The newly installed groundwater monitoring.wellswill be -developed•after being allowed to'stand a t <br /> minimum of 72 hours following completion. During development,-the'.•clarity of the:discharged=well <br /> water and selected groundwater parameters.(pH, temperature, and'conductivity) will be.monitored.When <br /> ry the discharge water runs clear and the groundwater parameters have stabilized,a grotindwater.sample will_, <br /> be collected. Groundwater removed from the well during-developmenf.and sampling=will be transported <br /> to an appropriately licensed facility for disposal. The groundwater samples will be:analyzed as described - <br /> in Task 5. .The newly installed wells will-be included in they uarterl .monitorin ro ram be" inn in with <br /> Y q Y g p, g g g <br /> the quarter following installation <br /> Task 4. Wellhead Surveying. <br /> Following installation,the elevation of the tap ofwell casings for all the_wells'At the-site will be surveyed . .; <br /> `. .. to mean sea-level by a California -licensed'surveyor, Horizontal:coordinates of the,-wells'will also be <br /> obtained. <br /> Task.5. Laboratory Analyses <br /> ' = Selected soil and groundwater samples will,be'submitted for ctiemicai'analysis at Sequoia Analyfical, a_. <br /> California state-certified Hazardous Material Testing Laboratory(ELAP..#1210,^#'4271,:'and WI624).:Soil <br /> k : and groundwater samples-will. be analyzed.for TPHg; benzene, toluene;:.ethylbenzene;and=xylenes <br /> (BTEX), and•MtBE by DHS LUFT Method. ,The groundwater samples will also'be analyzed-for tert-. <br /> <. . <br /> butyl alcohol (TBA), IvItBE; ethyl term-butyl"ether,(ETBE),'di-isopropyl ether'(D1PE),.tert=amyl,methyl <br /> ether(TAME)by EPA Method 8260. The drill'cuttings disposal characterization sample will be:analyzed. "a ; <br /> for TPHg, BTEX;and MtBE,by DHS.LUFT Method,and for total lead by EPA Method 6010. <br /> Task 6. .. .Vapor Extraction Pilot Test' , <br /> ? . <br /> GR will perform afive-day vapor extractton'+(VE)pilot test-at the site: .The'VE system'wtll be"connected to <br /> the`three'existing vapor extraction wells (VE-1-through -VE-3): The"purpose of the VIE' pilot test tis-to,. <br /> evaluate-the feasibility of the VE technology.and collect needed site specific data for the design of a VE` <br /> system if deemed necessary.:The VE pilot test will also provide GR with data to detennirie`the'area with the <br /> highest residual hydrocarbons in the •soil and if there is enough hydrocarbon:mass-to warrant-the installation <br /> of a VE system. A'trailer mounted, propane powered internal combustion (IC) engine will-'be used for the <br /> VE pilot test. The VE test will be performed in.accordance,with the San Joaquin Valley Air`Pollution <br /> Control District(SJVAPCD) source testing guidelines. Laboratory confirmation samples,will be collected <br /> { " in Tedlar bags and submitted for analysis to Sequoia Analytical Laboratories (FLAP #12'T4),,,, Vacuum' ` <br /> 240079.04 4 ' <br />