My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:10:28 AM
Creation date
5/5/2020 11:04:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> FNS '-995 a <br /> CONSTRUCTION NOTES pF�NM <br /> • /SFS�FS��TH <br /> 1.0 SCOPE <br /> 1.1 Current project is to install a soil vapor extraction (SVE) remediation system at the site. <br /> Remediation system construction will consist of installing: <br /> 1.1.1 SVE equipment consisting of an SVE Internal Combustion Engine (ICE) and <br /> 499-gallon propane tank with related propane fuel piping and valves. <br /> 1.1.2 Aboveground conveyance piping (2-inch diameter Schedule 80 PVC) to trans- <br /> port extracted soil vapor from three existing wells, through PVC piping, to the <br /> R. ICE for abatement prior to discharge. <br /> 1.1.3 Well head connection of PVC piping to three vapor wells (VW-1, VW-2, and <br /> VW-3, Figure 2) including installation of 2-inch PVC true-union ball valves and 0 <br /> to 100-inch H2O magnehelic gauges at each well head. <br /> 1.1.4 Connection of aboveground piping to ICE complete with well field control valve <br /> (2-inch true-union ball valve) and 0 to 200-inch H2O magnehelic gauge. <br /> 1 <br /> 1.2 Parties involved in this project: (1) Owner - BP Oil Company, (2) Engineer - Pacific <br /> Environmental Group, Inc., and (3)Contractor. <br /> 2.0 GENERAL NOTES <br /> 2.1 These notes will select options whenever the General Specifications give a choice of <br /> f materials or construction techniques. Also, THESE NOTES WILL SUPERSEDE THE <br /> L PROJECT DRAWINGS AND GENERAL SPECIFICATIONS IF CONTRADICTIONS OR <br /> CONFLICTS OCCUR BETWEEN THEM. <br /> Former Unocal Service Station 2859 1 May 31, 1995 <br /> 1665 Pacific Avenue at Walnut Avenue <br /> Stockton, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.