My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
1665
>
3500 - Local Oversight Program
>
PR0545638
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 11:10:28 AM
Creation date
5/5/2020 11:04:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545638
PE
3528
FACILITY_ID
FA0005998
FACILITY_NAME
UNION OIL SS#2859
STREET_NUMBER
1665
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
13702031
CURRENT_STATUS
02
SITE_LOCATION
1665 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.20 The contractor shall bear the cost of repair or replacement of utilities damaged during <br /> construction activities. Any property damage during construction activities by the <br /> Contractor that are not a part of these drawings, shall be the Contractor's responsibility <br /> to repair or replace. <br /> 2.21 Contractor shall install equipment and appurtenances in accordance with respective <br /> L manufacturer' installation manuals. Altemative equipment shall be approved by Engi- <br /> neer. <br /> 2.22 Contractor shall remove and dispose of all debris generated from the site as required by <br /> new work at Contractors expense_ <br /> 3.0 PLUMBING <br /> 3.1 All new soil vapor conveyance piping shall be pressure tested. Engineer must witness <br /> testing. Contractor shall notify Engineer a minimum of 48 hours prior to testing. All <br /> conveyance piping shall pneumatically pressure tested to 10 psi and held for 1 hour. No <br /> pressure drop will be permitted. Should testing indicate leakage or other default, the <br /> LContractor shall make acceptable repairs at Contractors expense. <br /> 3.2 Unless specifically noted on drawings PVC pipe shall be solvent welded in accordance <br /> with manufacturers'specifications and Caltrans Section 20-2.156(1). <br /> 3.3 After installing the propane tank the Contractor shall attempt to activate equipment on <br /> the new fuel delivery system or otherwise test the fuel delivery system to insure that the <br /> system and valves have been connected property. <br /> 3.4 True-union bail valves shall be used where specified. <br /> 4.0 PERMITS <br /> 4.1 Permits for the project will be applied, and paid for by the Engineer. The Engineer will <br /> obtain the San Joaquin Valley Unified Air Pollution Control District Authority to Construct <br /> permit. The Contractor will obtain all other permits required for construction and opera- <br /> tion of the remediation system. <br /> Former Unocal Service Station 2859 4 May 31, 1995 <br /> 1665 Pacific Avenue at Walnut Avenue <br /> Stockton, California <br />
The URL can be used to link to this page
Your browser does not support the video tag.