Laserfiche WebLink
i <br /> I <br /> I <br /> r three soil vapor extraction wells (VW-1 through VW-3). Monitoring Wells MW-1, <br /> MW-2, MW-3, and MW-6 are located on site and Wells MW-4, MW-S, and MW-7 are <br /> located northeast (downgradient) of the site. The soil vapor extraction wells are <br /> R located in the vicinity of the former product islands. Resna/Applied also installed <br /> 11 soil borings (B-1 through B-11). Most of these borings were converted to either <br /> groundwater monitoring wells or sail vapor extraction wells. <br /> E <br /> t <br /> k Additional information on soil and groundwater conditions in the vicinity of the site was <br /> presented in a PACIFIC Workplan dated August 6, 1993. <br /> 2.0 PROJECT SAFETY AUTHORITY <br /> A. ON-SITE PROJECT SAFETY <br /> Personnel responsible for the project safety are: <br /> Bob Boust Environ. Engineer <br /> Unocal Corporation <br /> Tim Ripp Sr. Staff Geologist <br /> Project Safety Officer <br /> (Pacific Environmental <br /> Group, Inc.) <br /> Mark Sullivan Company Safety Officer <br /> (Pacific Environmental <br /> Group, Inc.) <br /> The Project Safety Officer has the authority to upgrade or downgrade the provisions of <br /> this Site Safety Plan as site conditions change. In addition, the Project Safety Officer <br /> shall be responsible for-the following: <br /> o Safety Supplies & Equipment Inventory for the Project Site <br /> o Accident/Incident Reporting <br /> o Decontamination/Contamination Reduction Procedures. <br /> • i <br /> 3104001/SSPDRILL 2 October 7, 1993 <br /> it <br /> I <br />� J <br />