Laserfiche WebLink
i <br /> 01 September 2405 <br /> AGE-NC Project No 95-0173 <br /> IPage 6 of 10 <br />' Following sample collection,the samples were properly labeled,placed in a covered container, and <br /> transported under chain of custody to Cal Tech Environmental Laboratories(CTEL),a DHS-certified <br /> laboratories,for analysis Each sample was analyzed within 72 hours of collection for TPH-g,BTEX, <br /> Iand MTBE in accordance with EPA Methods 8015M and 8020/8021 <br />' 3 4 SOIL VAPOR EXTRACTION/IN-SITU AIR SPARGE REMEDIATION FINDINGS <br /> From field and laboratory data collected at the SVE remediation system between 22 December and <br />' 08 June 2005, AGE determined the average TPH-g concentration and the average flow rate, and <br /> calculated the approximate mass and volume of hydrocarbons removed <br />' 3 4 1 Results of Firstuarter 2005 Soil Vapor Extraction <br /> Q P <br /> Between 22 December 2004 and 16 March 2005 (first quarter 2005), the SVE remediation system <br /> was operational for approximately 2,016 hours (Tables 6 and 7) The IAS system operated <br />' contemporaneously with the SVE system During this operational period, SVE inlet flow rates were <br /> observed to average approximately 84 cubic feet per minute (cfm) calculated from differential <br /> pressures observed between 14 and 3 8 inches of water, with induced vacuum measurements <br />' observed between 40 and 65 inches of water Utilizing a PID, petroleum hydrocarbons were <br /> measured at concentrations as high as 227 parts per million (ppm) at regular intervals at the SVE <br /> inlet Field measurements are summarized in Table 6 <br /> IFirst Quarter 2005 Influent and effluent SVE air flow samples were collected on 02 January, 16 <br /> February and 16 March 2005 TPH-g was detected in the January and March influent SVE air flow <br />' samples at concentrations of 320 µg11 and 420 µg/l, respectively TPH-g was also detected in the <br /> January effluent air flow sample at a concentration of 180 µg/l Xylene was detected in both the <br /> January and March influent SVE air flow samples at concentrations of 12 µg/l xylenes, no other <br />' BTEX constituents were detected from first quarter 2005 influent or effluent air samples Analytical <br /> results of SVE air samples are summarized in Table 5 The GeoTracker confirmation pages of the <br /> submitted laboratory electronic deliverable format (EDF) files are included in Appendix B, the <br /> laboratory reports (CTEL laboratory I D 0501-107, 0502-103 and 0503-163), QA/QC reports, and <br /> chain of custody forms are presented in Appendix E, a plot of laboratory analyses of SVE influent <br /> TPH-g air stream concentrations versus time is included in Appendix F <br /> I <br /> 3 4 2 Results of Second Quarter 2005 Soil Vapor Extraction <br /> Between 16 March and 08 June 2005 (second quarter 2005), the SVE remediation system was <br />' Advanced GeoEnvironmental,Inc <br />