My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005587
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0005587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:18:57 PM
Creation date
5/5/2020 1:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005587
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30 December 1998 <br /> • AGE-NC Project No 95-0173 <br /> Page 10 of 12 <br /> Vapor samples will be collected on a monthly basis from the influent end of the VES utilizing the <br /> vacuum pump on a Mode_ amc vapor meter rThenno Environmental Instruments Inc ) The <br /> samples will be collected-in Tedlar 6a3 4nd transported to a DTSC-certified laboratory in a chilled <br /> container under ice and transported under chain-of-custody procedure <br /> During the"start-up"period for the SVE system,organic vapor and operational parameters(air flow, <br /> combustion temperature, volume of processed vapor, oxygen level and the lower explosive limits) <br /> will be monitored on a daily basis The anticipated start-up period will be approximately one week <br />' <br /> 43 IN-SITU AIR SPARGIN <br /> G SYSTEM DESIGN <br /> IIrvtiation of an IAS system is proposed within the"core"petroleum hydrocarbon-impacted area,IAS <br /> is proposed in conjunction with SVE concurrently at the site The proposed IAS system would <br /> comprise of an electric air compressor to in ect air beneath the water table using air sparging wells <br /> The compressor will provide betweer 3 and 10 pounds per squ�inchwasi)of air to each air sparge <br /> well The injected air will volatilize dissolved hyarbonter, and force hydrocarbon <br /> lievapors into the vadose zone, where they can be withdrawn by the SVE system <br /> The proposed TAS system will consist of the two existing IAS wells (AW-1 and AW-2), three <br /> existing ground water monitoring wells (MW-1, MW-2 and MW-3) located near the former UST <br /> area in addition to five proposed new IAS wells Approximate air sparging well locations are <br /> depicted in Figure 4 <br /> 4 3 1 In-situ Air Sparging Well Installation _f* Sw\_ 0 <br /> Installation of five IAS injection wells are proposed utilizing a truck-mounted drill rig equipped with <br /> I 8-inch diameter hollow stem augers Hollow stem augers will be cleaned prior to a vancement in <br /> each borehole The IAS injection wells will be advanced to depths of approximate) 40 feet b4 The <br /> IAS injection wells will be completed with 2-inch diameter, schedule 40 PVC casing emplaced <br /> through the hollow stem augers, utilizing five feet of slotted well casing (0 020-inch) from 35 to 40 <br /> et b,g A#3 i oiicStai Lapis Luster said will be poured down the annulus between the well casing <br /> and the inner wall of the hollow stem auger The filter pack will be placed adjacent to the screen <br /> I (0 020 inch screen size) from the bottom of the boring to a point approximately 2 feet above the top <br /> of the screen A three foot interval of coded bentonite pellets (Pell plug) will be placed above the <br /> filter pack and will serve as an annular seal Portland cement will be utilized to grout from the <br /> annular seal to surface grade A proposed IAS injection well diagram is included as Figures 8 <br /> Advanced GeoEniironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.