My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005587
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0005587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:18:57 PM
Creation date
5/5/2020 1:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005587
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • • <br /> 1 30 December 1998 <br /> AGE-NC Project No 95-0173 <br /> 1 Page 11 of 12 <br /> 1 4 3 2 In-situ Air Sparging Piping Systeem—� <br /> An electric air compressor will operate n� d ende o This will allow for control <br /> 1 of air flow to each IAS well and "surging" of the IAS system, if necessary, to prevent mounding <br /> and/or migration of the dissolved hydrocarbons A separate electrical source and meter will be <br /> necessary for the IAS system <br /> 1 A network of one-inch diameter, schedule 40 PVC piping will be installed in 6-inch wide by 12-inch <br /> deep trenches at the site The PVC piping will be routed from each IAS well head to an air <br /> rcompressor A PVC ball valve will be installed at each IAS well head so that air flow can be <br /> depressed independently A plan of the proposed air sparging piping system is depicted in Figure <br /> r5 <br /> The location of the air compressor is proposed near the southwest corner at the site (Figure 5) The <br /> r air compressor will be secured by a chain-linked, gated enclosure with measurements 15 feet wide <br /> by 20 feet long and six feet in height <br /> r• 4 3 3 In-situ Air Sparging Monitoring Activities <br /> r Quarterly ground water monitoring and sampling is proposed throughout the remediation period <br /> However, we recommen on measurements of ground water depth and dissolved oxygen from <br /> ground water monitoring wells at the site to determine if ground water mounding is occurring as a <br /> result of the IAS system operation <br /> 44 PERMITTING <br /> I An application for a site specific permit will be submitted to the San Joaquin Valley Air Pollution. <br /> Control District (SJVAPCD) prior to initiation of the remediation project In addition, proper <br /> building permits will be obtained from the City of Stockton Building Department for necessary <br /> construction work, including natural gas and electrical source installations <br /> All necessary well/boring permits will be submitted to the PHS-EHD prior to any drilling activities <br /> A minimum of 48 hours notice will be given to the PHS-EHD prior to performing any field work <br /> 45 SOIL VAPOR EXTRACTION/IN-SITU AIR SPARGING SYSTEM MAINTENANCE <br /> iThe SVE/IAS system will be maintained on a weekly basis, according to manufacturers <br /> Advanced CeoEnvironmental,Inc <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.