My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005587
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
2402
>
3500 - Local Oversight Program
>
PR0545640
>
ARCHIVED REPORTS_XR0005587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:18:57 PM
Creation date
5/5/2020 1:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005587
RECORD_ID
PR0545640
PE
3528
FACILITY_ID
FA0003900
FACILITY_NAME
PACIFIC PRIDE COMMERCIAL FUEL
STREET_NUMBER
2402
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
12506001
CURRENT_STATUS
02
SITE_LOCATION
2402 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 30 December 1998 <br /> AGE-NC Project No 95-0173 <br />' Page 4 of 12 <br />' Between August 1996 and October 1998, depth to ground water at the site generally decreased from <br /> 3 5 feet bsg to 25 feet bsg with a general ground water flow direction towards the no t Ground <br /> water elevation contour maps for the site were Included in previousQuarterlyReports p pared by <br />' AGE <br />' 3.0. SCOPE OF WORK <br /> Based upon the results in the Corrective Action Plan dated 05 May 1998 and Addendum to <br />' Corrective Action Plan dated 05 August 1998, the PHS-EHD is requiring gi ound water and soil <br /> remediation within the "core" petroleum hydrocarbon impacted area at the site <br />' Remediation within the "core" petroleum hydrocarbon impacted area at the site will consist of the <br /> following tasks <br /> a Permitting, planning and pre-field work activities, <br /> • Installation of remediation wells, <br />' • Installation of underground remediation piping system, <br /> • Soil vapor extraction system start-up period, <br /> • Monitoring and maintenance, <br /> • Progress/confirmation sampling <br /> Each of these tasks are discussed below in detail <br /> 1 <br />' 3 1 PERMITTING, PLANNING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable permits will be obtained from the PHS-EHD, San Joaquin Valley Air Pollution Control <br /> District(SJVAPCD) and City of Stockton Building Department prior to initiation of the remediation <br /> ro eCt AS ie Uired b PHS-EHD enni`ltitl- a licalth fluid scifel plan will be prepared in accordance <br /> i; � � y P �� y � �-_p <br /> with Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities <br />' (National Institute for Occupational Safety and Health Administration, U S Coast Guard and U S <br /> Environmental Protection Agency, 1985) Prior to digging activities, each proposed digging location <br /> will be clearly marked and an utility clearance obtained through Underground Service Alert <br />' Advanced GeoEmironmcntaI,Inc <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.