Laserfiche WebLink
TABLE 1-1 <br /> Report Organization <br /> Section Contents <br /> Section 1 Introduction Section 1 describes the history and past site use <br /> at the Tracy Yard,and outlines the organization <br /> of this RDIP. <br /> Section 2 Summary of Site Section 2 provides a summary of information on <br /> Characterization site geology,hydrogeology,and VOC occurrence <br /> in soil and ground water. Section 2 also <br /> summarizes existing remedial activities. <br /> Section 3 Technical Description of Section 3 provides a technical description of the <br /> the Dual Phase Extraction dual phase extraction technology,and <br /> Technology summarizes the operating parameters for dual <br /> phase extraction at the Tracy Yard. <br /> Section 4 Objectives and Design Section 4 lists the remedial objectives and <br /> Basis for the Remedial presents the design basis for implementation of <br /> Action the remedial action at the Tracy Yard. <br /> Section 5 Description of the Section 5 provides a detailed description of the <br /> Remedial Action treatment components of the remedial action. <br /> Section 6 Operation and Monitoring Section 6 describes the operational procedures <br /> of the Remedial Action for dual phase extraction,and presents the soil <br /> vapor and ground water monitoring program <br /> that will be conducted during the remedial <br /> action. <br /> Section 7 Construction Activities Section 7 discusses the activities associated with <br /> construction of the remedial action. <br /> Appendix A Design Calculations Appendix A contains spreadsheets utilized to <br /> establish design criteria for treatment of soil and <br /> ground water extracted at the Tracy Yard. <br /> Appendix B Design Drawings Appendix B includes design drawings for the <br /> remedial action. <br /> 1-4 <br />