My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 7
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
720
>
2900 - Site Mitigation Program
>
PR0009049
>
COMPLIANCE INFO_FILE 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2020 2:49:30 PM
Creation date
5/5/2020 2:05:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 7
RECORD_ID
PR0009049
PE
2960
FACILITY_ID
FA0004041
FACILITY_NAME
UP TRACY RAIL YARD
STREET_NUMBER
720
Direction
E
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
25001014
CURRENT_STATUS
01
SITE_LOCATION
720 E SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1-1 <br /> Report Organization <br /> Section Contents <br /> Section 1 Introduction Section 1 describes the history and past site use <br /> at the Tracy Yard,and outlines the organization <br /> of this RDIP. <br /> Section 2 Summary of Site Section 2 provides a summary of information on <br /> Characterization site geology,hydrogeology,and VOC occurrence <br /> in soil and ground water. Section 2 also <br /> summarizes existing remedial activities. <br /> Section 3 Technical Description of Section 3 provides a technical description of the <br /> the Dual Phase Extraction dual phase extraction technology,and <br /> Technology summarizes the operating parameters for dual <br /> phase extraction at the Tracy Yard. <br /> Section 4 Objectives and Design Section 4 lists the remedial objectives and <br /> Basis for the Remedial presents the design basis for implementation of <br /> Action the remedial action at the Tracy Yard. <br /> Section 5 Description of the Section 5 provides a detailed description of the <br /> Remedial Action treatment components of the remedial action. <br /> Section 6 Operation and Monitoring Section 6 describes the operational procedures <br /> of the Remedial Action for dual phase extraction,and presents the soil <br /> vapor and ground water monitoring program <br /> that will be conducted during the remedial <br /> action. <br /> Section 7 Construction Activities Section 7 discusses the activities associated with <br /> construction of the remedial action. <br /> Appendix A Design Calculations Appendix A contains spreadsheets utilized to <br /> establish design criteria for treatment of soil and <br /> ground water extracted at the Tracy Yard. <br /> Appendix B Design Drawings Appendix B includes design drawings for the <br /> remedial action. <br /> 1-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.