Laserfiche WebLink
' 18 October 2002 <br /> i AGE-NC Project No 95-0128 <br /> IPage 2 of 7 <br /> On 14 and 15 August 2002, a minimum of 3 casing-water volumes were purged from each well to <br /> be sampled using a PVC submersible two-stage pump or disposal bailer, except for well MW-9, <br /> which was purged dry after three gallons of water were removed Temperature,pH and conductivity <br /> of purged ground water were measured at various intervals, depending on the volume of water in <br /> each well, using an or Oakton water analyzers The field data and field sheets are included in <br /> Appendix A Purged water was discharged into the active ground water treatment systern for <br /> I disposal Following purging, the depth to ground water was measured to ensure that a minimum of <br /> 80% well-volume recharge had been achieved prior to sampling <br /> 2 12 Ground Water Sample Collection <br /> IA water sample was collected from each monitoring well using a new disposable bailer after <br /> allowing the wells to achieve a minimum 80%recovery of the pre-purge water volume hnmediately <br /> upon retrieval, the samples were transferred into three 40-milliliter (ml) EPA-approved volatile <br /> organic analysis (VOA) vials containing 0 5 ml 18% hydrochloric acid (sample preservative) and <br /> into one 1-liter amber bottle without the preservative The samples collected were logged on a chain- <br /> of-custody <br /> hain- <br /> of-custody form,placed in a chilled container and transported to McCampbell Analytical Inc (MAI), <br /> a California Department of Health Services(DHS)-certified laboratory In Pacheco,for analysis The <br /> ground water samples were analyzed for <br /> I • Total petroleum hydrocarbons quantified as gasoline and as diesel (TPH-g and TPH-d) by <br /> EPA Method 8015 Modified, <br /> • Benzene,toluene,ethyl benzene and xylene(BTEX)with methyl-tertiarybutyl ether(MTBE) <br /> by EPA Methods 8020, and <br /> • The oxygenated compounds di-isopropyl ether (DIPE), ethyl tertiary-butyl ether (ETBE), <br /> Imethyl tertiary-butyl ether (MTBE), tertiary-amyl methyl ether (TAME), tertiary butanol <br /> (TBA),methanol,ethanol, ethylene dibromide(EDB) and 1,2-dichloroethane(1,2-DCA) in <br /> accordance with EPA Method 8260 Modified <br /> 22 INTERIM REMEDIATION <br /> Between 05 June and 15 August 2002, an interim ground water pump-and-treat system was in <br /> continuous operation at the site, interim ground water pump-and-treat operation and maintenance <br /> procedures for the site were outlined in Monitoring Well Installation and Interim Ground Water <br /> Remediation <br /> i <br /> Advanced GcoEnvironmental Inc <br /> I <br />