My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 10:33:18 AM
Creation date
5/5/2020 3:36:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apr 27 1,2 12:25p Reliable PetroleumA 209-845-8953 p.4 <br /> I <br /> Monitoring System Ce Iihcation <br /> F. In-Tank Gaugin I 3r1 SIR Equipment: ® Check this box if tank gauging is used only r inventory ir� control, <br /> Q Check this box if no tank gauging or SIR eqt ipment is installed. <br /> This section must be tompleted if in-tank gauging equipment is used to perform 1$ak detmfion monitoring. <br /> Complete the following Ihecklist: <br /> Cl Yes D No* Has 11 input wiring been inspected for proper entry and termination, including testing for gi ound faults? <br /> El Yes ❑ No* Wer all tank gauging prabes visually inspected for damage and resfdue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> Q Yes ❑ No* Was accuracy of system water level readings tested? <br /> CJ Yes ❑ No* o'er al[probes reinstalled properly? <br /> Q Yes D No* We I all items on the equipment manufacturer's maintenance checklist completed? <br /> x In the Section FL belo describe)tow and when the deficiencies were or will be corrected. <br /> G. Line Leak Detect 6 {LLD}: p Check this box if LLDs are not installed. <br /> Corn fete the followin c Iecklist: <br /> 8 Yes ❑ No* For �ipment start-up or annual equipment certification, was a leak simulated to veri LLD performance? <br /> ❑ NiA (Che a!l that aPP)y) Simulated leak rate: 0 3 g.p.h.; 110-1 g,p-h ; ❑0.2 g.p.b. <br /> ® Yes ❑ No'' Were'all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No* Was e testing apparam properly calibrated? <br /> ® Yes " ❑ No* For mechanical LLDs. does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes Q No* For el ctronic LLDs,does the ntrbine automatically shut off if the LLD detects a leak? <br /> ® NIA <br /> © Yes p No* For elictronic LLDs, does the turbine automaticaliy shut off if any portion ofthe rnonitori system is disabled <br /> ® NIA or di �annected? <br /> ❑ Yes ❑ No* For a ectronic LLDs, does the turbine automatically shut off if any portion of the monitoring Systaat <br /> 0 N/A maif ctions or fails a test? <br /> ❑ Yes p No' For el tronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N1A <br /> lL® Yes ❑ No* Were Ml items on the equipment manufacturer's rnaimenance checklist completed? <br /> *In the Section K,bel=,43escribe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> of A <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.