Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> "fest Method Developed By: X Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer �g <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum— ❑ Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in PSI/Nitrogen Equipment Resolution: 1/10-IS PS[ <br /> Piping Run #1 Piping Run #2 Piping Run #3 Piping Run # <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 190' Approx. 200' _ Approx. 1 10, <br /> Product Stored: Regular 87 Plus 89 Super 91 <br /> Method and location of Test boot at STP#I Test boot at STP#2 Test boot at STP#3 <br /> piping-run isolation: <br /> Wait time between applying 30 Minutes 30 Minutes 30 Minutes <br /> pressure and startin test: <br /> Test Start Time: 1 9:30 9:40 9:50 <br /> Initial Reading(R,): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:30 10:40 10:50 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour I Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: X Pass ❑ Fail X Pass ❑ Fail X Pass ❑ Fail Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recomnzended.follol -tip.for failed tests) _ <br />