My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 10:33:18 AM
Creation date
5/5/2020 3:36:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page--of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: LJ SUMP Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 11 Pressure 7— Vacuum X Hydrostatic <br /> 0 Other(,Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator I Equipment Resolution: .002 <br /> Sump H3 Sump 11 <br /> SUMP I Sump 2 <br /> Sump Diameter: 4811 4899 4811 <br /> Sump Depth: 66711 6519 67" ------- <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height fi-om Tank Top to Top of Product 16" Product 12" Product 22" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 4019 39" 4199 <br /> Electrical Penetration: it <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Line 42" Water Line 4211 Water Line 43" <br /> Does turbine shut down when NA <br /> sump sensor detects liquid(both X Yes 0 No El NA X Yes 0 No 0 NA X Yes -I No 0 NA 0 Yes No <br /> product and water)?* <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe <br /> I X Yes D No DNA XYes 0No DNA XYes ']No DNA ElYes ENo __NA <br /> shutdown?' <br /> Was fail-safe verified to be <br /> operational?` Yes X No DNA Yes X No 0 NA Yes X o DNA OYON <br /> Yes o _I NA <br /> N <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and starting test: I . I <br /> Test Start Time: 9:55 10:55 11:45 <br /> Initial Reading(Rj): .001 .001 .001 <br /> Test End Time: 10:25 11:25 12:15 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass 0 Fail X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? X Yes 0 No 0 NA X Yes D No 0 NA X Yes E No L.NA 0 Yes 0 No E NA <br /> Was sensor properly replaced and X Yes 0 No 0 NA XYes 0No DNA X Yes 0 No El NA D Yes 0 No -7 NA <br /> verified functional after testing? I I I <br /> Comments— (include information on repairs made prior to testing, and recommended jblloiv-ztpfor failed tests) <br /> If tile entire depth of the sump is not tested, specify how much was tested. If the answer to aLn y of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.