My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 10:33:18 AM
Creation date
5/5/2020 3:36:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page —of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> "Test Method Developed By: ❑UDC Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC#9&10 UDC# 11&12UDC It 13&14 UDC# 15&16 <br /> UDC Manufacturer: Bravo Bravo Bravo _ Bravo <br /> UDC Material: Coated Steel Coated Steel Coated Steel Coated Steel <br /> UDC Depth: 35" 35" 35" 35" — <br /> Height from UDC Bottom to Top 18" 18" 19" 18" <br /> of Highest Piping Penetration: _. <br /> Height from UDC Bottom to No Electrical No Electrical No Electrical No Electrical <br /> Lowest Electrical Penetration: Penetrations Penetrations Penetrations Penetrations _ <br /> Condition of UDC prior to Dry Dry Dr� Dry <br /> testing: <br /> I <br /> Portion of UDC Tested Water Level 20" Water Level 20" Water Level 2.1" Water Level 21"_ I <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both X Yes No ❑NA X Yes No DNA X Yes No [INA X Yes No ❑NA <br /> I <br /> product and water)?` <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarm_ ed Not Alarmed <br /> Is system programmed for fail- X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No 1 NA X Yes ❑No ❑NA <br /> safe shutdown?` _ ---.- <br /> Was fail-safe verified to be Yes X No ❑NA Yes X No ❑NA Yes X No i NA Yes X No -NA <br /> operational?* -- <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 Minutes <br /> water and starting test _ - <br /> Test Start Time: 11:15 11:20 11:55 12:00 _ <br /> Initial Readin (Ri): .001 .001 _ .001 .001 <br /> Test End Time: 11:45 11:50 12:25 12:30 <br /> I <br /> Final Readin (RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> ------- <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30Minutes .005/30 Minutes _ <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑ Fail X Pass ❑ Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No—' NA X Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes ❑No 17 NA X Yes ❑No ❑NA <br /> verified functional after testing? I <br /> Comments —(include information on repairs made prior to testing, and reco177n7ended.folloly-zip_for failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.