Laserfiche WebLink
SWRCB,January 2002 Page--_of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is No:Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested X <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑ Industry Standard Professional Engineer <br /> ❑Other(Spec) ---------_._- <br /> Test Method Used: ❑ Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Equipment Resolution_ —_ <br /> -1, <br /> Spill Box# Spill Box# Spill Box # Spill Box # <br /> Bucket Diameter: -_- <br /> Bucket Depth: — __--. <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: -------------.... -- —--- 1— --- -- <br /> Test Start Time: _ <br /> Initial Reading(Rr): _._. <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: I' <br /> Change in Reading(RF-Rr): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and recommended folloi!-up Jor failed tests) — <br />