Laserfiche WebLink
KEI—P89-1104.P1 <br /> November 22 , 1989 <br /> Page 4 <br /> i <br /> I <br /> PHASE IV <br /> I <br /> once the zero line is established- through the completion of Phase <br /> III, a final remedial plan will be developed. This plan will be i <br /> submitted by mid-December, 1990 ' <br /> I <br /> The first step of phase IV will be to conduct pumping tests to <br /> define aquifer characteristics. I <br /> i <br /> Interpretations of the subsurface stratigraphy will be used in I <br /> consideration of various remedial- options. ' <br /> Sincerely, <br /> Kaprealian Engineering, Inc. ' <br /> I <br /> � s <br /> Richard M. Bradish <br /> Staff Engineer <br /> Attachments: Tables 1 & 2 <br /> Location Map <br /> Site Plan <br /> i <br /> i <br />