My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009566
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7303
>
3500 - Local Oversight Program
>
PR0545644
>
ARCHIVED REPORTS_XR0009566
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:14:16 AM
Creation date
5/6/2020 9:56:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009566
RECORD_ID
PR0545644
PE
3528
FACILITY_ID
FA0003814
FACILITY_NAME
TOSCO CORPORATION #30878*
STREET_NUMBER
7303
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07736021
CURRENT_STATUS
02
SITE_LOCATION
7303 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> KEI-P89-1104 .QR4 <br /> February 3 , 1992 <br /> Page 4 <br /> The analytical results of the samples collected from the old and <br /> new fuel tank pit, the product pipe trench, and the vapor pipe <br /> trench are summarized in Table 4 . The analytical results for the <br /> waste oil tank bottom and the remote fill piping soil samples are <br /> summarized in Table 5 . Analytical results for the water sample are <br /> summarized in Table 6. To comply with the requirements of the <br /> regulatory agencies and based on the analytical results, KEY <br /> proposed the installation of four monitoring wells. Results of the <br /> soil samples from the tank excavation are summarized in KEI 's <br /> report (KEI-P89-1104 .R1) dated January 8, 1990. <br /> Mr. Knoll of the SJCPHS, per telephone conversations on February 7 <br /> and March 8, 1990, required that the water production well be <br /> properly destroyed due to the levels of TPH as gasoline indicated <br /> in the laboratory analyses results. Mr. Knoll also required that <br /> one additional water sample be collected after all piping and the <br /> pump were removed from the well, and also that the well be purged <br /> of at least three to four well volumes prior to sampling. <br /> A site inspection conducted on March 15, 1990 (by Mr. Don Braun of <br /> KEI and Mr. Knoll) , indicated that the vicinity of the existing <br /> well had been paved with asphaltic concrete and that an old <br /> concrete Christy box was placed around the well and remaining <br /> piping. The well seal appeared intact. The well casing was <br /> locally exposed and appeared to be steel and about six-inches in <br /> diameter. The service station was connected to the municipal water <br /> system and disconnected from the on-site water well prior to April, <br /> 1990. <br /> Details of the existing water well at the site were researched at <br /> the California Department of Water Resources (DWR) in Sacramento. <br /> Mrs. Betty Swatsenbarg of the DWR reviewed the State records on <br /> March 14 , 1990, and reported that no records were available for <br /> this well at the DWR. Based on Mrs. Swatsenbarg's extensive <br /> experience at the DWR, the subject water well was probably drilled <br /> and installed prior to 1951. At that time, steel casings were <br /> driven into the subsurface and the remainder of the wells were <br /> generally open below the casing. <br /> On April 23 , 1990, an attempt was made to destroy the existing six- <br /> inch diameter water well by west Hazmat of Rancho Cordova, <br /> California. The proposed plan involved (1) drilling out the well <br /> casing, using 12-inch O.D. (6-1/4-inch I.D. ) hollow-stem augers to <br /> the total depth of the casing, (2) pulling out the old casing, (3) <br /> redrilling the well to the full depth, (4) and pressure grouting <br /> the well by the use of a tremae pipe and a neat cement grout. <br /> During field activities on April 23 , 1990, the old pump (5 feet <br /> long) and pump casing (60 feet long) were removed from the well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.