My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
INSTALL_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:58:34 PM
Creation date
5/6/2020 2:47:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1999
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Installation <br /> Diaphrag Leap Detectors <br /> C XLA Part No, 11Wi6_/DLD Part No. 116017 - <br /> Tec fi ii ieig deeadd terms ere—ad t2uout,tw,t ihte Ntarohw,to brny otv:itbtl to the preoof"0(hamM*tJf vx6ow ri.k laveik or te;mMMnt=moms tlon eVW*'.iog th,HA of rM prdtw:t. <br /> a indicate.ute.nA'A C,a hazard which erW emu as 8i k"-tooft-el it ury, 1_-AW46 1>1—ra F.hmaard Whkh v w oto.n tgm6a nlltwr penouat <br /> dee Lh or iutgtarttta l prererty�i—g-if ige orod. V rY:,I—Lh ur zub.tmn dal prMerty d.mage if igW A <br /> ]7Mitntatn pre.enre�Ca hm:m rd which rvv::arun.wi¢n plr`lvmil�N-7', {1d{y�ia6. !{.e�.:el in.4ucCiura VI111Lttalluttoaa,opefader,i+r aninfe. <br /> daaLh or uh.tn.bd yrwpertY dam.6a if igecrad. :+apCa A ve vu pmrrmmt Dut n M uu�ad fn <br /> 'Jif tory h—rda <br /> riefore installing leak detector, review the Application section in Leak Det*3ctor Mani-tai*5141 for <br /> limitations or restrictions on usage. <br /> THIS iNSTRUCT1ON SHEET ,SHOULD BE NET WITH TliE E:VD USER.. OF THE LFAK <br /> DETECTOR FOR REFERENCE. <br /> Tampering with the screws or seals on pump.) <br /> this leak detector may inhibit opera- 3. Examine straight bore below two-incli thread fr.r <br /> tion and will void warranty, corrosion roughness. If found to be rough, smooth <br /> DD uutl wire submersible pumps to run with fine emery paper. <br /> continuously. Red Jacket line leak 4. Apply L"1-.Classified non-toxic pipe thread sealant to <br /> detectors willnotperform leak tests on the two-inch tbreads on the detector.Lubricate"O" <br /> pumping systems that run continu- ring on leak detector. <br /> ously. 5. Screw the deter-tor into the pump, Tighten w-ifh <br /> This llci Jacket leak detector is to be installed into the wrench. <br /> t;wo-inch threaded tapping on top of the Red Jacket 6. Connect power to pump at load center. <br /> submersible pump. For proper installation,the follow- 7• Clear res Ri'lirg air from system as follows: <br /> Ing steps should be fohowed in sequence: a- Turn or, dispenser that is farthest from leak <br /> detector but do not open norzle.Wait 4 or 5 mi:iutes <br /> • ALL AIR MUST BE OUT OF THE or more. Look for leaks on parts worked on. <br /> SYSTEM, FOR LEAK DETECTOR TO b. Shut ofI'pu-rnp and allow to stand four or five <br /> WORK PROPERLY, Before installing minutes. Then start pump agLin .and open nozzle <br /> Irak detector in the purnp,fill the sys- farthest from leak detector, <br /> tem with product by runningthe pump c. Continue to dispense enough gasoline(about 20 <br /> and delivering product from each dis- tz) 30 gallons)to pump ALL air from tha system, <br /> penser(starting with thefarthestfrorn ManIf,on opening the nozzle,you find the <br /> the pump and working to the pump) Flow restricted to about 3 gprn or leas, <br /> until all air is removed from system. the leak detector haF not opened. Re- <br /> Certain regulatory bodies require the leak detectors to peat Step 7a. with increased running <br /> remain in the system ager the lines have beenn installed, time of pump to insure the purging of <br /> The :_mea may be purged of air by lack pressuring the all air. All air must be purged from tht <br /> lines with an inert gas t,uch as helium or nitrogen to a system or leak detector will restrict <br /> pressure of 25 psi.This may be done at the impact valve flow tD about three gpm- <br /> urder the dispenser. When this pressure has been 6- Affix enclosed decals to dispenser trial gicss on grade <br /> reached,theleakdetectorwill beinthe open position,By of gasoline upon which the leak detector is being <br /> turning on the pump and gradually bleeding the gat; installed. Additional decals,are available;call cus- <br /> fhm the I=ris through it valve at the impact;valve of the tomer service at 1-900-262-7539, <br /> farthest dispenser, the line may be purged of air, 9. Inspect all threaded joints to assure they are tight <br /> L:sronnect power to the submersible and not leafing, <br /> pump when installing and removing TEST OF T11E LEAK DETECTOR <br /> has pressurization equipment. EPA•regulations require annual veri- <br /> 1. Disconnect power to pump at the load center.Tag or ficaLon of operation of leak detector. <br /> 1ocK ont the breaker to avoid the pump being turned <br /> on accidentally. To assure maintenance of leak detee- <br /> 2. Remove the two-inch plug from the top of the Red tion capability, Red Jacket requires <br /> Jacket pump. If fne two-inch plug is found W be sc that operation of the mechanical leak <br /> eight that it cannot be removed, the submersible detector be verified by testing upon <br /> aliculd be rernoved from the tank and placed in a start up and that testing of t? e leak <br /> vise. Remove the f i ctional element assembly next detector be performed routinely, at <br /> to the pipe plug The plug should then come out least annually.Test procedure options <br /> readily if a large pipe wrench is used. Replace. for n.zechanil leak d��feztor~ are ex- <br /> functOnal olemen y assembly securely and replace <br /> the pump in the tank. (See,Step 3 l fere replacing plainedin Red Jacket EngirceringRe- <br /> Ports, R.J20 and RJ21 and on pp. 23 <br /> tar.d 28 of this manual- <br /> Ii.J 5191C� 3/93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.