My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009105
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
4555
>
3500 - Local Oversight Program
>
PR0545652
>
ARCHIVED REPORTS_XR0009105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:01:22 PM
Creation date
5/6/2020 3:34:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009105
RECORD_ID
PR0545652
PE
3528
FACILITY_ID
FA0003638
FACILITY_NAME
JEMCO VENETIAN CARDLOCK
STREET_NUMBER
4555
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11017001
CURRENT_STATUS
02
SITE_LOCATION
4555 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEARWA' TER <br /> G R O U P I N C <br /> All wells will be surveyed to the north side of the top of casing for elevations <br />' to the nearest ±0 01 foot Elevations will be referenced either to mean sea <br /> level or to a project datum A project datum is typically chosen for its <br /> location such that it will remain unchanged in the event of site construction <br />' or other site disturbances Where required, the wells will be surveyed by a <br /> licensed land surveyor, relative to the nearest benchmark <br />' Well Develol2ment <br /> I All newly installed wells will be developed prior to sampling to remove fine <br /> grained sediments from the well and stabilize the filter pack and the disturbed <br /> aquifer materials Well development will consist of surging with a surge <br /> block and removing water from the well with either a pump or bailer, until <br /> the well is free of sediment, or after 10 well casing volumes have been <br /> removed Where appropriate, temperature, pH, specific conductance and <br />' turbidity will be monitored during well development. All development <br /> equipment will be cleaned prior to use and between wells with an Alconox <br /> solution, then rinsed in clean water. All data collected during development <br /> will be presented on the well development data sheet <br /> Ground Water Sampling <br /> Prior to the start of work, a decontamination area will be established This <br /> Iwill be in a secured area and consist of an Alconox solution wash, a first rinse <br /> and a second rinse Any down hole equipment will be decontaminated prior <br /> to use. <br /> Prior to g ansampling ling anY well, the static water level will be <br /> P <br /> measured with an electronic water sounder or an oil/water interface probe to <br /> Ithe nearest ±0.01 foot if floating product is detected, interface probe results <br /> will be confirmed by lowering a clear disposable polyethylene bailer down the <br /> well and measuring the product thickness to the nearest ±0 01 foot, in the <br /> Ibailer Any monitoring well containing detectable amounts of floating <br /> product will not be purged or sampled. Field observations such as well <br /> I integrity as well as water level measurements and floating product <br /> thicknesses will be noted on the gauging data/purge calculations form <br /> All monitoring wells to be sampled shall be purged using either a PVC bailer <br /> or a submersible pump Physical parameters (pH, temperature and <br /> conductivity) of the purge water will be monitored for stabilization during <br /> CLEARWATER GROUP,INC 3 December 16,1994 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.