My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PERSHING
>
5608
>
3500 - Local Oversight Program
>
PR0545653
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 4:37:21 PM
Creation date
5/6/2020 3:55:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545653
PE
3528
FACILITY_ID
FA0003727
FACILITY_NAME
CHEVRON STATION #96465 (INACT)
STREET_NUMBER
5608
Direction
N
STREET_NAME
PERSHING
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10815011
CURRENT_STATUS
02
SITE_LOCATION
5608 N PERSHING AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
288
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA l~ GEORGE OEUKMEJIAN,Governer <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD--- ` <br /> CENTRAL VALLEY REGION <br /> 3443 ROUTIER ROAD y <br /> SACRAMENTO, CA 95827-3098 <br /> aw, <br /> DEC 1989 <br /> 13 December 1989 <br /> - ENVIiltii'�!-d1t^J1:^.i- `ricHLTH <br /> PERMIT 1 SERVICE- <br /> Ms. Diane Hinson <br /> Supervising RENS <br /> Environmental Health Division <br /> San Joaquin County Department of Public Health Services <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> CHEVRON 5608 NORTH PERSHING, STOCKTON - QUARTERLY MONITORING REPORTS AND <br /> PROPOSED WORK PLAN FOR.ADDITIONAL GROUND WATER INVESTIGATION <br /> We have reviewed the recent Quarterly monitoring reports prepared by Weiss <br /> Associates and the 12 September 1989 work plan prepared by Dames & Moore <br /> consultants for this site. <br /> I <br /> The quarterly ground water monitoring program has shown a significant increase <br /> in hydrocarbon concentrations in some of the monitoring wells. Because marry <br /> of the on-site wells are!now dry or contain insufficient water for adequate <br /> sampling, Chevron has submitted a proposed work plan for additional <br /> investigation to further define the extent of ground water contamination. <br /> The proposed scope of work will include installation of four additional ground <br /> water monitoring wells, and testing to determine the hydraulic properties of <br /> the aquifer materials. The proposed design and locations for the monitoring <br /> wells appears appropriate for. this phase of the investigation. Therefore, we <br /> recommend approval of the proposed 'work plan <br /> If you have any questions, please call me at (916) 361-5731 . <br /> THOMAS D. PELTIER <br /> Engineering Geologist <br /> TDP/tdp <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.