Laserfiche WebLink
TRPNSM I TTED FROM 91636z�"98� 10 . 03 . 8 ! 16 ' P . 03 %D&M Sac . <br /> SEP 2 1, - „ , <br /> -� <br /> BLAINE 1374 TULLY RD.,SUITE W5 <br /> SAN JOSE, CA 95122 <br /> {; TEDD SERVICES INC. (408) 996.5535 <br /> Septemb <br /> Chevron VSA, Inc. <br /> 2410 Camino Ramon <br /> San Ramon, CA 94583 <br /> Attn: Rork Reffsa <br /> SITS: <br /> CURVRON SERVICE STATION X10, 6465 <br /> 6604 NOS 111 PERSHI.NG <br /> S'TOCKTON, CALIFURNIA <br /> PROJECT: <br /> TANK REMOVAL AND REPLACHMSN`l' <br /> WITH NEW DOUBLE CONTAXNMENT <br /> UNDERGROUND STORAGE TANKS <br /> SAMPLOD ON: <br /> SEPTEMBER 9t 1986 <br /> TAU,-RE 'VA SAMPLING REPORT 88251-B-2 <br /> This report describes the initial environmental sampling and documentation <br /> performed by our firm on this project. In addition to the Sampling Report, <br /> itself, supporting documents are provided se, attachme3nt.a. Phase incttidee the <br /> chain of custody and the certified analytical laboratory report. All these <br /> documents should be Rept together and preserved as a filer of interrelated <br /> .ecords which, tog'ether$ comprise the documentation of the wark performed at <br /> the site. If additional work is regWrcdl then a cumulative report format <br /> will be followed so that al information on they various plias;ee of warn at tbo <br /> site can be eaeaily reviewed. <br /> TTIS SCOPE OP WORK <br /> In accordance with your re;quast, field personnel would bF dispatched W the. <br /> site to observe the tank resmovall collect eamplos, ar-r-ange for the proper <br /> ares:lyses of the samples and maintain adequate documoRr,thtion resulting fn the <br /> ,asuance nt x formal Sampling Report. The colle+ation of environmental <br /> eamplee wan to be porformed ire accor-dance wfth t,hm roquiroMthnts of r.ha State <br /> Sampling Rnport $8257-14-2 CHEVRON 646.5 pages 1 <br />