Laserfiche WebLink
• HSC 25290.1(c)(1) Primary containment not tight(after Jun 2004). Liquid was <br /> detected at the 87 product union/sheer valve and the 87 product union of the under <br /> dispenser containment for dispensers 1/2 and 5/6. The service technicians removed <br /> the liquid and tightened the piping, indicating a leak in the primary piping. All <br /> primary containment for the UST system must be tight. During the inspection,the <br /> technician tightened the piping unions and cleaned out the released fuel. As noted in <br /> your Inspection Report, this item was corrected at the time of the inspection. In addition, a <br /> full statement regarding the return to compliance for this item was drafted on site with the <br /> help of Inspector Aris Veloso, and is attached for your review and records. <br /> • HSC 25290.1(c3),25290.2(c3) Secondary containment not constructed to prevent <br /> water intrusion. Water was found in the 91 product fill sump,vapor sump,91 <br /> product STP sump,and diesel STP sump. Secondary containment shall be <br /> constructed to prevent any water intrusion into the system by precipitation, <br /> infiltration, or surface runoff. The service technician removed approximately one <br /> gallon of liquid from the 91 product fill sump,approximately one cup of liquid from <br /> the vent sump, approximately two tablespoons of liquid from the 91 product STP <br /> sump,and approximately one teaspoon of liquid from the diesel STP sump and <br /> returned the sensors to their proper location. Immediately contact a properly <br /> licensed,trained, and certified contractor to address the water intrusion into the vent, <br /> 91 product fill sump,91 product STP sump,and diesel STP sump under permit and <br /> inspection of the EHD. This was corrected on site. As noted in your Inspection Report, <br /> this item was corrected at the time of the inspection. <br /> The diesel secondary containment fill sump is not liquid and vapor tight. The gasket <br /> for the inner sump opening is missing. Secondary containment shall be impervious <br /> to the liquid and vapor of the substance contained and constructed to prevent <br /> structural weakening as a result of contact with any hazardous substances released <br /> from the primary containment. Immediately contact a properly licences,trained,and <br /> certified contractor to make repairs to the UST system under permit and inspection <br /> of the EHD. On February 2, 2016, BP Testing and Maintenance Vendor, Gettler-Ryan, Inc., <br /> replaced the noted gasket, then returned on February 25, 2016 to check and clean it. A <br /> copy of the February 25, 2016 work order is attached for your review and records. <br /> It is our policy to address deficiencies, issues of concern, and/or agency requests regarding our retail <br /> facilities immediately. Based on the corrective actions detailed above, it is our understanding that the <br /> items of alleged non-compliance have been resolved. If this is not correct, please contact me as soon <br /> as possible. <br /> ManyReg H E U"I'--I VE, <br /> MAR 0 2 2016 <br /> Sarah Samuels <br /> Retail Compliance Coordinator ENVIRONMENTAL <br /> NE,61TH nPpApTMENT <br /> Enclosure <br />