My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
0
>
2900 - Site Mitigation Program
>
PR0516264
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:14 PM
Creation date
5/7/2020 10:50:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516264
PE
2950
FACILITY_ID
FA0012536
FACILITY_NAME
CAL TRANS RT 99 WIDENING
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
HWY 99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K L E I N F E L D E R <br /> An employee owned company <br /> File No. 20-YP8-090 % PIV — r-15 <br /> September 22, 1999E u <br /> Mr. Tim Fleming JUN 13 2000 <br /> Mark Thomas & Company <br /> 7300 Folsom Boulevard, Suite 203 ENVIRONMENTAL HEAL <br /> Sacramento, CA 95826 PERMIT 1 SERVICES <br /> Subject: Revised Scope of Work and Cost Estimate <br /> Additional Environmental Services <br /> Phase I ESA Recommendations 1, 9, 11 <br /> Route 99 Widening <br /> Route 4 to Hammer Lane <br /> Stockton, California <br /> Dear Mr. Fleming: <br /> In accordance with your request, Kleinfelder has prepared the attached revised scope of work <br /> and cost estimate to provide additional environmental services at the above referenced site. The <br /> scope of work is based upon your request and recommendations made in the Phase I <br /> Environmental Site Assessment (20-419001-POI, report dated March 5, 1999) conducted by <br /> Kleinfelder for the project. The scope of work (workplan) is described in Attaclunent A, with <br /> Kleinfelder Typical Field Protocols as Attachment B. The cost estimate is included as <br /> Attachment C. A work requisition authorizing the work as a modification to our existing <br /> contract with you is included as Attachment D. We can begin work upon receipt of signed work <br /> requisitions. <br /> We appreciate the opportunity to provide our services to you. Should you require additional <br /> information or have any questions regarding this report, please contact us at(209) 948-1345. <br /> Respectfully submitted, <br /> KLEINFELDER, INC. <br /> /aurLieURacca <br /> Regional Environmental Manager <br /> Robert"Tony" Martin, R.G., R.E.A. <br /> Area Manager <br /> Attachments <br /> 20-YP8-090/2019P300/2019W025 Page i of i <br /> Copyright 1999 Kleinfelder, Inc. September 22, 1999 <br /> KI l l\I ELDER 2282.5 Fast Wrtle Street, Stockton, CA 05211:5-41-9-1 (_01)1 948-!345 1_109)948-0621 fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.